INSP-Final Inspection | 6/19/2008 | 6/19/2008 | 6/19/2008 | P | PASS |
Forrest France
|
|
|
The scope of this fire sprinkler permit work passed inspection, permit finaled.
|
INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 | A | FAIL |
Troy Cobbley
|
|
|
The project can not be finaled. The rough-in passed and the piping can be covered.
|
Sprinkler Plan Check | 5/8/2008 | | 5/27/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 5/27/2008 | | 5/27/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 5/27/2008 | | DONE |
Cathy Brown
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/27/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 5/27/2008 | | |
|
|
|
|
Case Summary | | | 5/8/2008 | | DONE |
|
|
|
|
Application received | | | 5/8/2008 | | |
|
|
|
|
Pending Assignment by SAM | 5/8/2008 | | | | |
|
|
|
|