INSP-Final Inspection | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | PASS |
Forrest France
|
|
|
Fireproofing repaired at beams per conditions, final fire sprinkler inspection passed, permit finaled.
|
INSP-Sprinkler Rough-in | 6/3/2008 | 6/3/2008 | 6/3/2008 | P | PART |
Forrest France
|
|
|
OH sprinkler system modifications at the tenant remodel area are acceptable, noted three locations on approved drawings where beam clamps have been installed and fireproofing will need to be repaired.
|
Inspection Record Card- Fire | 5/14/2008 | | 5/14/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 5/14/2008 | | DONE |
Cathy Brown
|
|
|
tlk to tyson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/14/2008 | | PASS |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 5/14/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/13/2008 | | 5/13/2008 | | PASS |
Scott Arellano
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2008 | | DONE |
|
|
|
|
Application received | | | 5/9/2008 | | |
|
|
|
|
Pending Assignment by SAM | 5/9/2008 | | | | |
|
|
|
|