| Miscellaneous action | | | 5/8/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
| INSP-Final Inspection | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. A tree was removed from infront of the strobe in the employee breakroom.
|
| INSP-Alarm Testing | 12/24/2008 | 12/31/2008 | 12/31/2008 | A | CANC |
Troy Cobbley
|
|
|
mark Phone #: ###-####
|
| INSP-Alarm Testing | 12/24/2008 | 12/30/2008 | 12/30/2008 | A | CANC |
Troy Cobbley
|
|
|
mark Phone #: ###-####
|
| INSP-Alarm Testing | 12/24/2008 | 12/29/2008 | 12/29/2008 | A | FAIL |
Troy Cobbley
|
|
|
Need the north red alarm strobe repaired and tested, the new duct smoke detector does not shut down the hvac unit and the fire alarm system needs to be finished in the existing east rooms.
|
| INSP-Final Inspection | 12/23/2008 | 12/24/2008 | 12/24/2008 | A | PART |
Forrest France
|
|
|
Alarm and supervisory conditions for both the new sprinkler risers and the two existing risers tested today, functionality testing passed for all four preaction systems, noted the wall mounted PIV for the new west riser is not adjusted correctly to activate within 1/5 of valve closure, also discovered the outside bell at the existing riser is not operational. Discussed SD locations at beam pockets in the corridor and mounting heights of existing pull stations at the east side of the building.
|
| Case Summary | | | 12/23/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2008 | | DONE |
|
|
|
|
| Inspection Record Card- Fire | 12/23/2008 | | 12/23/2008 | | DONE |
|
|
|
|
| Telephone call | | | 12/23/2008 | | DONE |
|
|
|
t/c w charlie bayne at ###-#### - permit ready and fees given
|
| Permit Ready to Issue | | | 12/23/2008 | | DONE |
|
|
|
|
| CHANGE STATUS TO (ISS) | | | 12/23/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
| Alarm Plan Check | 12/18/2008 | | 12/23/2008 | | PASS |
Sam Rogers
|
|
|
Plan revision #4 adding access control magnetic door lock release, RTU/HVAC shut down, modified 2 red clean agent strobes to 15 cd.
|
| INSP-Alarm Testing | 12/16/2008 | 12/18/2008 | 12/18/2008 | A | FAIL |
Troy Cobbley
|
|
|
No inspection was performed today but a correction notice was left with Mark. The correction notice lists: Provide resubmittals showing the door mag/locks and test the interconnection with the fire alarm panel, the two amber strobes inside of and the two red strobes outside of the large preaction room are the incorrect candella as per the plans, all of the alarm interconnections with the existing and new preaction sprinkler systems need to be tested, the graphic annunciator is non-functional and needs to be tested/repaired, the alarm system for the large preaction room needs tested, the facp needs to be re-programmed to operate the preaction valves per review comment #3, provide tests reports reflecting the devices already tested as marked on the resubmitted plans and provide a completed/installed fire alarm system that is fully functional with a clear panel as per IFC 907.18.
|
| Plan resubmittals received | | | 12/18/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
Plan mod rec'd- one copy of app and one copy of sheets 1-9; taken to fire review
|
| Plan assigned to (Stephanie) | 12/18/2008 | | 12/18/2008 | | DONE |
Patricia Smith
|
|
|
|
| INSP-Alarm Testing | 12/16/2008 | 12/17/2008 | 12/17/2008 | A | DONE |
Troy Cobbley
|
|
|
Additional initiating devices were tested today. See the city approved plans for devices. The fire alarm plans need to be resubmitted showing the door magnets. Also the fire alarm panel is having undefined troubles showing up and the graphic annunciator is not operating. No more testing will be done until the fire alarm system is completely functional.
|
| INSP-Alarm Testing | 12/15/2008 | 12/16/2008 | 12/16/2008 | A | DONE |
Troy Cobbley
|
|
|
See the city approved plans for devices tested. The audio/visuals were also tested. The interconnections between the NAC panels tested ok. The existing NAC panel in the mechanical room needs 12.7 ah batteries. Supervision failed on the 110ah battery backup.
|
| CHANGE STATUS TO (ISS) | | | 12/10/2008 | | DONE |
|
|
|
|
| (F) Reprint permit | | | 12/10/2008 | | DONE |
|
|
|
|
| Alarm Plan Check | | | 12/9/2008 | | PASS |
|
|
|
See comments - contractor to keep previously approved set (review dated 5-16-08) in addition to these approved plans on job site. Call plan reviewer with any questions.
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 12/9/2008 | | DONE |
|
|
|
|
| Telephone call | | | 12/9/2008 | | DONE |
|
|
|
Left a message for Charlie Bayne letting him know that they would need to keep the previously approved set (dated 5-16-08) as well as this newly approved plan modification on the job site. I explained in the message that the same items clouded for the first approved set were not clouded in this plan modification and that the inspector would not know what to look at. I asked that future submittals keep the same clouded areas consistent throughout the approval process. I also noted this in the comments for the inspector.
|
| Inspection Record Card- Fire | 12/9/2008 | | 12/9/2008 | | DONE |
|
|
|
|
| Telephone call | | | 12/9/2008 | | DONE |
|
|
|
left message w ursula for charlie bayne at ###-#### - permit ready for pickup - no fees
|
| Permit Ready to Issue | | | 12/9/2008 | | DONE |
|
|
|
|
| Plan resubmittals received | | | 12/3/2008 | | |
Barbara Stitt
|
|
|
|
| Plan assigned to (Stephanie) | 12/3/2008 | | 12/3/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
| FIR-Aging Inspection | 8/15/2008 | 8/15/2008 | 8/15/2008 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
| Alarm Plan Check | | | 5/16/2008 | | PASS |
|
|
|
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2008 | | DONE |
|
|
|
|
| Inspection Record Card- Fire | 5/16/2008 | | 5/16/2008 | | DONE |
Patricia Smith
|
|
|
|
| Telephone call | | | 5/16/2008 | | DONE |
|
|
|
t/c w charlie bayne at ###-#### - permit ready and fees given
|
| Permit Ready to Issue | | | 5/16/2008 | | DONE |
|
|
|
|
| Issue and Print Permit | | | 5/16/2008 | | DONE |
|
|
|
|
| Telephone call | | | 5/15/2008 | | DONE |
|
|
|
Phone call with Charlie Bayne. Plans had been denied due to matrix representation of double interlock for the preaction system. He stated that he would revise the matrix and that no devices needed to be changed and asked if he could just fax in or email a new set of Matrices to attach to the plans. I let him know that was fine as long as that is all that would change due to the interlock issue.
|
| Alarm Plan Check | | | 5/14/2008 | | FAIL |
|
|
|
Plans denied. See review comments
|
| Miscellaneous action | | | 5/14/2008 | | DONE |
|
|
|
Faxed review comments to SimplexGrinnell
|
| Application received | | | 5/13/2008 | | |
|
|
|
|
| Plan assigned to (Stephanie) | 5/13/2008 | | 5/13/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|