Miscellaneous action | | | 5/8/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 11/5/2008 | 11/5/2008 | 11/5/2008 | P | PASS |
Forrest France
|
|
|
Remainder of fire alarm testing completed satisfactory, fire alarm permit finaled.
|
INSP-Final Inspection | 11/3/2008 | 11/4/2008 | 11/5/2008 | P | CANC |
Forrest France
|
|
|
RAFE W/PROTEX Phone #: ###-#### Internet Inspection Request from: Randy Vail
|
INSP-Final Inspection | 10/23/2008 | 10/23/2008 | 10/23/2008 | P | PEND |
Forrest France
|
|
|
Final pending HVAC unit startups to enable duct detector testing.
|
INSP-Final Inspection | 10/6/2008 | 10/8/2008 | 10/8/2008 | A | PART |
Forrest France
|
|
|
Permit cannot be finaled at this time due to non-functional HVAC units. FACP, batteries, phone lines, and sprinkler monitoring tested okay, one flow switch adjusted while on site, signals verified.
|
INSP-Final Inspection | 10/2/2008 | 10/6/2008 | 10/6/2008 | A | CANC |
Troy Cobbley
|
|
|
BEN MacDONAGH Phone #: ###-#### Internet Inspection Request from: Randy Vail
|
INSP-Alarm Testing | 9/3/2008 | 9/3/2008 | 9/3/2008 | A | NR |
Forrest France
|
|
|
Phone #: ###-####
|
FIR-Aging Inspection | 8/29/2008 | 8/29/2008 | 8/29/2008 | | DONE |
Forrest France
|
|
|
On site visit with general contractor regarding status of work, waiting for phone lines to be installed prior to fire alarm testing.
|
Issue and Print Permit | | | 5/30/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/29/2008 | | 5/29/2008 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 5/29/2008 | | DONE |
|
|
|
t/c w jay at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/29/2008 | | DONE |
|
|
|
|
Alarm Plan Check | | | 5/28/2008 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/28/2008 | | DONE |
|
|
|
|
Application received | | | 5/22/2008 | | |
|
|
|
|
Plan assigned to (Stephanie) | 5/22/2008 | | 5/22/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Case Summary | | | 5/22/2008 | | DONE |
|
|
|
|