Permit Information
Permit NumberFIR08-00369
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 800 W DIAMOND ST
Project NameACE CO
Customer Number 
ePlanReview 
Description
11/22/08 Revised FIR OH Scope:
These plans were submitted as an as-built of the work performed. Four additional heads were added during construction to meet code. The revision has been noted as Rev. #1 and dated 11/17/08. FIR UG Scope: Beginning from an existing 6” UG gate valve located off of Diamond Street, run 96’-0” of 6” C-900 out and rise up into the existing structure to supply the system riser.
Revised FIR OH Scope:
Beginning from a 6” supply located with the 1 hour rated riser room located at the SE corner of the building, install a 4” vertical wet riser and a wet grid system to serve through out the entire structure. The system supply will be controlled from a wall PI valve. Any future rack plans shall be submitted under a separate permit. The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/10/2009 DONE
Sent for archiving
Miscellaneous action  3/10/2009 DONE
Sent for archiving
INSP-Final Inspection1/14/20091/16/20091/16/2009APASS
DetailsForrest France
Final fire sprinkler inspection and acceptance testing completed satisfactory, permit finaled.
INSP-Sprinkler Rough-in1/15/20091/15/20091/15/2009PPART
DetailsForrest France
Correction notice items per last inspection are finished, verified resubmitted plans for field changes, rough-in passed.
INSP-Sprinkler Rough-in/Hydro1/14/20091/15/20091/15/2009APART
DetailsForrest France
OH hydrostatic testing completed satisfactory.
INSP-Final Inspection1/14/20091/15/20091/14/2009PCANC
DetailsForrest France
Scheduled by a contractor via Hello! on 1/14/2009 at 11:08:00 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jan 14 2009 11:25AM.
INSP-Sprinkler Rough-in/Hydro12/30/200812/31/200812/31/2008PFAIL
DetailsForrest France
Approved plan set on site does not match floorplan or actual installation including heads and piping beneath three mezzanines, added mech. tees and uprights, noted one work area overspaced beyond 130 ft2, missing forward flow appuratus at the riser, need PRV due to grid system, hydrostatic test postponed until changes are approved.
INSP-Sprinkler Rough-in/Hydro12/29/200812/30/200812/30/2008PCANC
DetailsTroy Cobbley
To be rescheduled
PLANS/APPL TAKEN TO FRONT DESK  11/26/2008 DONE
DetailsCathy Brown
Inspection Record Card- Fire11/26/2008 11/26/2008 DONE
DetailsCathy Brown
Telephone call  11/26/2008  
DetailsCathy Brown
tlk to tony larson ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/26/2008 DONE
DetailsCathy Brown
(F) Reprint permit  11/26/2008  
CHANGE STATUS TO (ISS)  11/26/2008 DONE
DetailsBarbara Stitt
Sprinkler Plan Check11/18/2008 11/22/2008 PASS
Details
Note: This was the 3rd review of these previously approved plans. There were 4 heads added. Plans are approved by Bryan Johnson
(F) Reprint permit  11/18/2008  
Plan resubmittals received  11/18/2008  
received "4" sets of applications with "4" sets of plans- put plans on fire shelf
INSP-Supply line flush7/7/20087/10/20087/10/2008APART
DetailsForrest France
UG fire supply line flush completed acceptable.
INSP-Supply line flush7/2/20087/8/20087/8/2008APART
DetailsForrest France
Field inspection was intended for an UG hydrostatic test. Hydro completed satisfactory-testing passed.
INSP-Sprinkler Rough-in/Hydro7/8/20087/8/20087/8/2008PPART
DetailsForrest France
UG fire supply line installation is approved for bury.
INSP-Supply line flush7/3/20087/7/20087/7/2008PNR
DetailsForrest France
tony/brian ###-#### Note: 1:00 Phone #: ###-#### Inspection rescheduled per conversation with contractor.
INSP-Supply line flush7/1/20087/7/20087/2/2008ACANC
DetailsForrest France
Scheduled by a contractor via Hello! on 7/1/2008 at 11:35:54 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 2 2008 7:16AM.
PLANS/APPL TAKEN TO FRONT DESK  6/19/2008 DONE
Details
Telephone call  6/19/2008 DONE
Details
t/c tony larson at ###-#### - permit ready and fees given
Permit Ready to Issue  6/19/2008 DONE
Details
Issue and Print Permit  6/19/2008 DONE
Plan assigned to (OutSourced)5/30/2008 6/19/2008 PASS
DetailsPatricia Smith
6/19/2008 09:11:47 P_S - activity updated through activity FIRA22 from case FIR08-00369.
Inspection Record Card- Fire6/19/2008 6/19/2008 DONE
Details
Sprinkler Plan Check6/9/2008 6/16/2008 PASS
Details
plans are approved
Plan resubmittals received  6/9/2008  
DetailsTisha Gallop
Received four copies of appliation, submittal packet, calcs, product info, and sheet FP1 of 1; taken to fire review
Sprinkler Plan Check5/30/2008 6/5/2008 FAIL
Details
These plans were denied do to lack of or missing information. Upon request, the denied set of plans may be retrieved from my office for salvage with in 5 working days.
Application received  5/27/2008  
Case Summary  5/27/2008 DONE
Pending Assignment by SAM5/27/2008