Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR08-00374
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 250 E PARKCENTER BLVD
Project NameSUPER VALU Phase 5B
Customer Number 
ePlanReview 
Description
This fire alarm permit is to add and remove notification as needed to accommodate a 1st floor tenant improvement. No initiating devices are part of this permit scope.
Associated building permit: BLD08-00795 *(SUPERVALUE)* - *(PHASE 5B)*-(1st Floor) To remodel a 10,009 sq.ft. area within existing 257,200 sq.ft. 1st story, located in the interior southwest quadrant of the building. New office space construction and remodel per tenant improvement plans. Work to include, selective demolition of interior nonbearing partitions, construction of new partitions for private office spaces, small conference rooms, and open office area, repair and relocate existing suspended ceiling and lighting, relocate any diffusers as necessary, this building is fully fire sprinklered for unlimited area any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. FPP Project contact the team asigned to this building via cell phones to request all insp. The fir07-01005 permit to have all sprinkler heads throughout the building is the control permit to remove all rated corridors under the 2003/2006 IBC. 301
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  5/8/2009 DONE
Plans taken to records to scan
INSP-Final Inspection6/11/20086/12/20086/13/2008PPASS
DetailsForrest France
Fire alarm system modifications passed field test, one faulty appliance replaced and retested while on site, permit finaled.
Alarm Plan Check  6/3/2008 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/3/2008 DONE
Inspection Record Card- Fire6/3/2008 6/3/2008 DONE
Details
Telephone call  6/3/2008 DONE
Details
t/c w charlie bayne at ###-#### - permit ready and fees given
Permit Ready to Issue  6/3/2008 DONE
Issue and Print Permit  6/3/2008 DONE
Application received  5/29/2008  
Plan assigned to (Stephanie)5/29/2008 5/29/2008 DONE
DetailsStephanie L. Cobbley