INSP-Final Inspection | 7/1/2008 | 7/1/2008 | 7/1/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled, one missing escutcheon installed while on site.
|
INSP-Sprinkler Rough-in | 6/5/2008 | 6/6/2008 | 6/6/2008 | A | PART |
Forrest France
|
|
|
Approved for cover at the drop ceiling areas within the tenant remodel.
|
Issue and Print Permit | | | 6/2/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/30/2008 | | 5/30/2008 | | PASS |
Scott Arellano
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/30/2008 | | DONE |
Cathy Brown
|
|
|
lft vm with brodie ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 5/30/2008 | | 5/30/2008 | | DONE |
Cathy Brown
|
|
|
|
Permit Ready to Issue | | | 5/30/2008 | | DONE |
Cathy Brown
|
|
|
|
Application received | | | 5/29/2008 | | |
|
|
|
|
Pending Assignment by SAM | 5/29/2008 | | | | |
|
|
|
|