Miscellaneous action | | | 5/8/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 9/29/2008 | 9/30/2008 | 9/30/2008 | A | PASS |
Forrest France
|
|
|
Fire alarm permit work passed field inspection, building map updated while on site, signals verified, as-builts for address changes recieved. Tested tamper at the PIV due to device replacement, noted access for the duct detector above the cooler to be provided prior to building life safety final approval. Fire alarm permit finaled.
|
INSP-Final Inspection | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | PART |
Forrest France
|
|
|
Testing was not for a final insp, only the testing of interconnection from the kitchen hood suppression sytem to the fire alarm panel.KR
|
FIR-Aging Inspection | 9/9/2008 | 9/9/2008 | 9/10/2008 | | DONE |
Forrest France
|
|
|
Work in progress, construction underway.
|
Inspection Record Card- Fire | 6/10/2008 | | 6/10/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/10/2008 | | DONE |
|
|
|
left vm w dean for david uli at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/10/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/10/2008 | | DONE |
|
|
|
|
Alarm Plan Check | | | 6/9/2008 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2008 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 6/4/2008 | | 6/5/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Application received | | | 6/4/2008 | | |
|
|
|
|