| Miscellaneous action | | | 3/10/2009 | | DONE |
|
|
|
Sent for archiving
|
| INSP-Final Inspection | 10/31/2008 | 10/31/2008 | 10/31/2008 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
| (F) Reprint permit | | | 10/31/2008 | | DONE |
|
|
|
|
| CHANGE STATUS TO (ISS) | | | 10/31/2008 | | DONE |
|
|
|
|
| Sprinkler Plan Check | 10/24/2008 | | 10/30/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2008 | | |
Cathy Brown
|
|
|
|
| Issue and Print Permit | | | 10/30/2008 | | DONE |
|
|
|
|
| Inspection Record Card- Fire | 10/30/2008 | | 10/30/2008 | | DONE |
Cathy Brown
|
|
|
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2008 | | DONE |
Cathy Brown
|
|
|
|
| Permit Ready to Issue | | | 10/30/2008 | | DONE |
Cathy Brown
|
|
|
|
| Plan resubmittals received | | | 10/24/2008 | | |
|
|
|
|
| Plan assigned to (OutSourced) | 10/22/2008 | | 10/22/2008 | | DONE |
Cathy Brown
|
|
|
|
| Plan resubmittals received | | | 10/6/2008 | | |
|
|
|
Plan modifcation; rec'd 1 copy of application, 6 copies of submittal packet, and 3 copies of pages f100 and f101, taken to fire review
|
| INSP-Sprinkler Rough-in | 9/16/2008 | 9/16/2008 | 9/17/2008 | P | PART |
Troy Cobbley
|
|
|
The bucket test passed. The two head area flowed 31 gallons and the single head area flowed 22 gallons. I gave the ok to cover the piping with the condition that as-built plans and hydraulic calculations are re-submitted to the city. This is due to the interconnecting piping to and between the four manifolds, as installed, does not match the city approved plans.
|
| (F) Reprint permit | | | 9/16/2008 | | DONE |
|
|
|
|
| CHANGE STATUS TO (ISS) | | | 9/16/2008 | | DONE |
|
|
|
|
| INSP-Sprinkler Rough-in/Hydro | 9/12/2008 | 9/15/2008 | 9/15/2008 | A | FAIL |
Troy Cobbley
|
|
|
The updated plans were not on site but Sam Rogers and I went ahead and conducted the single and the double head flow verifications. The single head test passed in both the single head remote area and when just a single head was flowed in the two head area. But when the two head test was performed not enought water was put out. Infact not enough water was available when measured right at the pump. No rough-in inspection of the piping has been performed yet.
|
| Inspection Record Card- Fire | 9/15/2008 | | 9/15/2008 | | DONE |
|
|
|
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/2008 | | |
|
|
|
|
| Telephone call | | | 9/15/2008 | | DONE |
|
|
|
left vm for dave pera at ###-#### - permit ready and fees given
|
| Permit Ready to Issue | | | 9/15/2008 | | DONE |
|
|
|
|
| Sprinkler Plan Check | 9/8/2008 | | 9/12/2008 | | PASS |
|
|
|
plans are approved - This was the third review of these previously approved plans. The plans were resubmitted due to modifications made in the field during construction. Three heads within the remote areas were affected as a result.
|
| Plan resubmittals received | | | 9/8/2008 | | |
|
|
|
received 1 fire sprinkler application, 6 copies of fire safty system, and 3 plans stamped as re-subs and put in fire slot for Brian Johnson to review///DLD
|
| INSP-Sprinkler Rough-in | 8/28/2008 | 8/29/2008 | 8/29/2008 | A | FAIL |
Troy Cobbley
|
|
|
The plans have not been resubmitted showing the additional piping and the tenting was not complete. No inspection was performed though I did stop at the job site.
|
| INSP-Sprinkler Rough-in/Hydro | 8/27/2008 | 8/28/2008 | 8/28/2008 | A | FAIL |
Troy Cobbley
|
|
|
The single head test barely made the 18gpm requirement and the 26.6gpm requirement for the two heads failed. The plans will have to be resubmitted if changes are made that effect piping or hydraulic calculations. Also the piping had not been tented yet.
|
| INSP-Sprinkler Rough-in/Hydro | 8/26/2008 | 8/27/2008 | 8/27/2008 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 8/26/2008 at 1:29:31 PM. Contact: ###-####. Inspection cancelled from web by: Alexandra Rahn
|
| Issue and Print Permit | | | 8/25/2008 | | DONE |
|
|
|
|
| Sprinkler Plan Check | 8/13/2008 | | 8/19/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 8/19/2008 | | DONE |
Cathy Brown
|
|
|
|
| Inspection Record Card- Fire | 8/19/2008 | | 8/19/2008 | | DONE |
Cathy Brown
|
|
|
|
| Telephone call | | | 8/19/2008 | | DONE |
Cathy Brown
|
|
|
tlk to dave pera ###-#### that permit and fees are ready to be picked up
|
| Permit Ready to Issue | | | 8/19/2008 | | |
|
|
|
|
| Sprinkler Plan Check | 7/30/2008 | | 8/13/2008 | | PEND |
|
|
|
Cornel Res. FIR08-00402
This project is on hold pending further information from the contractor.
|
| Plan resubmittals received | | | 7/30/2008 | | |
Sam Rogers
|
|
|
|
| Meeting | | | 7/18/2008 | | DONE |
|
|
|
Front counter meeting with Mitch Cornell, General Contactor/owner of residence. The plumber Dave Pera, listed the G/C's fax number on the application. Both GC and plumber indicate they never received a fax of the review but G/C did access Tidemark where the review was posted on line. Denied plans were held over 5 days by B. Johnson, plan reviewer, as indicated in Tidemark and subsequently discarded per policy. Therefore the plan sets are no longer available. I explained they would be of little use in this situation, since the plans have to be revised and the entire plan set is relatively limited. Sprinkler contractors frequently don't go to the trouble of picking up denied plan sets of this size. Faxed a copy of the review comments to the plumber and gave hard copy to GC; and explained resubmittal to be brought to our permit counter.
|
| Sprinkler Plan Check | 6/10/2008 | | 7/1/2008 | | FAIL |
|
|
|
These plans were denied due to the lack of or missing information. A complete resubmitted is required ASAP. Upon request, the denied set of plans may be retrieved from my office for salvage.
Note The denied set of plan review comments will be faxed to the contact fax. ###-####
|
| Sprinkler Plan Check | 6/10/2008 | | 6/26/2008 | | PEND |
|
|
|
Note: Project Alpine Res FIR08-00402 is on hold pending the delivery of missing head and dev ice data, additional copies of the [plans and permit applications.
|
| Application received | | | 6/10/2008 | | |
|
|
|
|
| Pending Assignment by SAM | 6/10/2008 | | 6/10/2008 | | DONE |
Sam Rogers
|
|
|
|