INSP-Final Inspection | 7/15/2008 | 7/16/2008 | 7/16/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work okayed for final, one missing escutcheon to be installed today per contractor.
|
INSP-Sprinkler Rough-in | 7/3/2008 | 7/3/2008 | 7/3/2008 | P | PART |
Forrest France
|
|
|
Overhead system modifications approved for cover at the drop ceilings, QR heads provided.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2008 | | |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 7/1/2008 | | 7/1/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 7/1/2008 | | DONE |
Cathy Brown
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 7/1/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 7/1/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/11/2008 | | 6/30/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 6/11/2008 | | |
|
|
|
|
Pending Assignment by SAM | 6/11/2008 | | | | |
|
|
|
|