INSP-Final Inspection | 8/21/2008 | 8/22/2008 | 8/22/2008 | P | PASS |
Forrest France
|
|
|
Drop ceilings installed, fire sprinkler permit finaled.
|
INSP-Final Inspection | 8/14/2008 | 8/15/2008 | 8/15/2008 | P | PART |
Forrest France
|
|
|
Permit final pending completion of work at the basement level new fabrication room as red-lined on plans.
|
INSP-Final Inspection | 8/13/2008 | 8/14/2008 | 8/14/2008 | P | NR |
Forrest France
|
|
|
Project is not ready for final per conversation with general contractor, inspection to be scheduled 8/15.
|
INSP-Sprinkler Rough-in | 7/29/2008 | 7/29/2008 | 7/29/2008 | P | PART |
Forrest France
|
|
|
Resubmittal drawings accepted, rough-in install is approved for cover.
|
(F) Reprint permit | | | 7/28/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/28/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/25/2008 | | 7/25/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 7/25/2008 | | DONE |
Cathy Brown
|
|
|
tlk to lilly to let you know that permit is ready to be picked up
|
Permit Ready to Issue | | | 7/25/2008 | | DONE |
Cathy Brown
|
|
|
|
Plan resubmittals received | | | 7/24/2008 | | DONE |
|
|
|
|
Plan assigned to (Scott) | 7/24/2008 | | 7/24/2008 | | PASS |
Scott Arellano
|
|
|
Plan scope modified. Plans approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2008 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 6/12/2008 | | 6/16/2008 | | PASS |
Scott Arellano
|
|
|
6/16/2008 08:23:59 SJA - activity updated through activity FIRA22 from case FIR08-00416.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/16/2008 | | 6/16/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/16/2008 | | DONE |
|
|
|
t/c w cam hess at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/16/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/16/2008 | | DONE |
|
|
|
|
Application received | | | 6/12/2008 | | |
|
|
|
|
Pending Assignment by SAM | 6/12/2008 | | | | |
|
|
|
|