INSP-Final Inspection | 9/3/2008 | 9/4/2008 | 9/4/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/28/2008 | 7/29/2008 | 7/29/2008 | P | CANC |
Troy Cobbley
|
|
|
To be cancelled per Jim
|
INSP-Final Inspection | 7/23/2008 | 7/24/2008 | 7/24/2008 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations where the upright sprinkler heads are located too close to another and where protection is lacking. Also the restroom has not been finished. As-builts are required showing the heads that have been deleted.
|
Issue and Print Permit | | | 7/21/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 7/16/2008 | | 7/16/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 7/16/2008 | | DONE |
Cathy Brown
|
|
|
lft vm with jim danes ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 7/16/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/1/2008 | | 7/15/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 7/1/2008 | | |
|
|
|
|
Pending Assignment by SAM | 7/1/2008 | | | | |
|
|
|
|