Permit Information
Permit NumberFIR08-00471
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 10331 W ASPEN MEADOW ST
Project Name 
Customer Number 
ePlanReview 
Description
FIR Sprinkler Scope:
Install a new 13D modified fire sprinkler system through out the two story single family dwelling with a finished basement to a single row of dry sidewall sprinklers along the wall common to attached garages and the living space. System shall be equipped with an alarm initiating device and an outside alarm. The system will be supplied from an existing 2” poly dual service fire line and back flow device, (by others) All fire sprinkler work and related, which includes a service water supply, the system backflow prevention device (provided by others), shall be per NFPA 13D, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to BLD08-00821.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/20/200810/20/200810/20/2008PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection10/14/200810/15/200810/15/2008PFAIL
DetailsTroy Cobbley
Provide sticker on bell, provide inspection tag on riser, hydraulic sticker, space heads and cover the plastic supply piping and the cpvc riser piping as discussed. It does not appear that the underground supply has been flushed either.
INSP-Supply line flush10/14/200810/15/200810/15/2008AFAIL
DetailsTroy Cobbley
Provide sticker on bell, provide inspection tag on riser, hydraulic sticker, space heads and cover the plastic supply piping and the cpvc riser piping as discussed. It does not appear that the underground supply has been flushed either.
INSP-Sprinkler Rough-in/Hydro8/1/20088/4/20088/4/2008APASS
DetailsTroy Cobbley
The tenting has been modified and the piping can now be covered. Todd was in the process of lowering the two garage sidewall heads. I will verify them at the final.
INSP-Sprinkler Rough-in/Hydro7/31/20088/1/20088/1/2008AFAIL
DetailsTroy Cobbley
The tenting in the master bedroom and the master closet need modified to provide better tenting. The two sidewall heads now have the correct coverage but are too close to the ceiling. I contacted Todd and let him know the situation.
INSP-Sprinkler Rough-in/Hydro7/29/20087/29/20087/29/2008PPART
DetailsTroy Cobbley
Rough to cover Inspection is basically passed but as-builts are needed to show the supply piping changes from the basement to the second floor and the added head at the top of the stairs. Also the standard coverage sidewall heads in the garage are overspaced.
Issue and Print Permit  7/21/2008 DONE
Inspection Record Card- Fire7/18/2008 7/18/2008 DONE
DetailsCathy Brown
Telephone call  7/18/2008 DONE
DetailsCathy Brown
tlk for jim heiller ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  7/18/2008 DONE
DetailsCathy Brown
Sprinkler Plan Check7/1/2008 7/17/2008 PASS
Details
Plans are approved by Bryan Johnson
Application received  7/1/2008  
Pending Assignment by SAM7/1/2008