Miscellaneous action | | | 5/11/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Forrest France
|
|
|
Fire alarm field testing passed, permit finaled.
|
INSP-Final Inspection | 9/17/2008 | 9/18/2008 | 9/19/2008 | P | NR |
Forrest France
|
|
|
Rick- call 30 min prior to going Phone #: ###-####
|
Issue and Print Permit | | | 7/16/2008 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 7/10/2008 | | 7/14/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 7/14/2008 | | DONE |
|
|
|
Spoke to Jeff at E2 regarding notification for sprinkler monitoring. The plans indicate notification though it is not required. I asked Jeff if he would like to ommit the notification, or if he would like to resubmit showing full notification coverage throughout the building. He opted to ommit the notification.
|
Alarm Plan Check | | | 7/14/2008 | | PASS |
|
|
|
See redlines on drawings along with review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/14/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/14/2008 | | 7/14/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/14/2008 | | DONE |
|
|
|
t/c w keith johnson at ###-####7 - permit ready and fees given
|
Permit Ready to Issue | | | 7/14/2008 | | DONE |
|
|
|
|
Application received | | | 7/10/2008 | | |
|
|
|
|