Miscellaneous action | | | 3/10/2009 | | DONE |
|
|
|
Sending for archiving
|
INSP-Final Inspection | 2/20/2009 | 2/20/2009 | 2/20/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 12/30/2008 | 1/2/2009 | 1/2/2009 | P | CANC |
Troy Cobbley
|
|
|
Jeremy V is the contact, thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus
|
INSP-Supply line flush | 9/3/2008 | 9/5/2008 | 9/5/2008 | A | PASS |
Troy Cobbley
|
|
|
The underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed. A 3psi loss was noted.
|
INSP-Supply line flush | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | CANC |
Troy Cobbley
|
|
|
To be canceled per Jeremy. This is an underground flush. Jeremy is the contact. Thanks Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | CANC |
Troy Cobbley
|
|
|
To be canceled per Jeremy. This is an underground hydro Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/12/2008 | 8/12/2008 | 8/12/2008 | P | PASS |
Troy Cobbley
|
|
|
The underground piping is ok to cover.
|
INSP-Conference | 8/4/2008 | 8/4/2008 | 8/4/2008 | P | DONE |
Troy Cobbley
|
|
|
I stopped by the job site at 7:30 this morning and found that the underground supply line had been buried even after I had told the general contractor not too. I told him that the piping will need to be uncovered and reburied at the correct depth. I also called Randy with Shilo and let him know that the piping can not remain at the current depth and that it will need to be corrected. I had also left a message on his cell phone late friday afternoon after speaking with Sam Rogers.
|
INSP-Sprinkler Rough-in | 7/28/2008 | 7/29/2008 | 7/29/2008 | A | FAIL |
Troy Cobbley
|
|
|
There were no approved plans on site. I went ahead and looked at what was in the trench and found 6" C900 pipe. The piping starts out at 4'-1" at the connection (sidewalk) and drops to 4'-3" below the wood on the side of the building at the thrust block/stub-in at the building. Actual grade is not known but I would assume it would be below the wood siding of the building which would make the pipe higher than the 4'3" as meaured at the thrust block. I notified Stan of what I had found by phone since he was not on site.
|
Inspection Record Card- Fire | 7/23/2008 | | 7/23/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/23/2008 | | DONE |
|
|
|
t/c w lillie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/23/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/23/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/23/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Sprinkler Plan Check | 7/16/2008 | | 7/21/2008 | | PASS |
|
|
|
plans are approved
|
Plan resubmittals received | | | 7/16/2008 | | |
|
|
|
received "5" sets of plans & fire spr application-- put plans on fire shelf
|
Plan assigned to (OutSourced) | 7/15/2008 | | 7/15/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 7/10/2008 | | DONE |
|
|
|
|
Application received | | | 7/10/2008 | | |
Marsha Smylie
|
|
|
|
Pending Assignment by SAM | 7/10/2008 | | | | |
Sam Rogers
|
|
|
|