Miscellaneous action | | | 3/10/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 1/8/2009 | 1/9/2009 | 1/9/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Forward flush also passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/15/2008 | 12/16/2008 | 12/16/2008 | P | PASS |
Troy Cobbley
|
|
|
The remaining hydro tests passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/8/2008 | 12/9/2008 | 12/9/2008 | A | PASS |
Troy Cobbley
|
|
|
The second floor hydro test passed. The first floor hydro test failed.
|
INSP-Sprinkler Rough-in | 12/3/2008 | 12/4/2008 | 12/4/2008 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the deficiencies that have been corrected on the first and second floors. I pointed out to Charles that the FDC is possibly located too close to the roof rain gutter and side of the building.
|
INSP-Sprinkler Rough-in | 11/20/2008 | 11/21/2008 | 11/21/2008 | P | FAIL |
Forrest France
|
|
|
See red lines on plan set for areas in need of correction (2nd floor only inspected today) including an obstructed head at a janitors room, one missing arm-over hanger, heads overspaced at the restrooms, six overspaced heads at the southeast lounge room.
|
INSP-Sprinkler Rough-in | 10/15/2008 | 10/20/2008 | 10/20/2008 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for the locations of the defieciencies. Only the rooms on the first floor that do not have red correction marks in them can be covered. No rooms on the second floor can be covered. As-builts need to be provided prior to a final inspection which show all of the changes as marked on the city approved plans.
|
Issue and Print Permit | | | 10/15/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/3/2008 | | 10/14/2008 | | PASS |
|
|
|
These modified plans and calculation are approved. A total of 42 heads in the 4 hydraulically most demanding remote area's that were affected as a result of the of the plan and calculation modifications. Plans are approved by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2008 | | PASS |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 10/14/2008 | | 10/14/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 10/14/2008 | | DONE |
Cathy Brown
|
|
|
lft ms with recepectionist for lily ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/14/2008 | | DONE |
Cathy Brown
|
|
|
|
Plan resubmittals received | | | 10/3/2008 | | |
|
|
|
received 5 apps , 5 information books,and 5 copies of sheets 1,2,3,of 3 gave plans to Ken
|
Plan resubmittals received | | | 10/2/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/15/2008 | | 9/27/2008 | | FAIL |
|
|
|
These plans were denied. The plan reviewer could not verify the calculation node points due to clarity.
Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set will be maintained for 5 working days
|
Plan resubmittals received | | | 9/15/2008 | | DONE |
|
|
|
received 5 sets of resubmittal plans and books stamped and put in fire box///dld
|
Sprinkler Plan Check | 7/16/2008 | | 7/29/2008 | | FAIL |
|
|
|
These plans were denied due to missing or lack of information. Upon request the denied set of plans may be retrieved from my office for salvage. The denied set of plans will be maintained for 5 working days
|
Early Start | | | 7/18/2008 | | DONE |
|
|
|
Early start request approved. Doc attached.
|
Case Summary | | | 7/16/2008 | | |
|
|
|
|
Application received | | | 7/16/2008 | | |
|
|
|
|
Pending Assignment by SAM | 7/16/2008 | | | | |
|
|
|
|