Permit Information
Permit NumberFIR08-00515
StatusFinaled
Name QUALITY ELECTRIC INC
Site Address 10136 S FEDERAL WAY
Project NameMICRON NANOFAB
Customer Number 
ePlanReview 
Description
This fire alarm permit is to add a smoke detector, shunt trip control and monitoring a sprinkler tamper switch due to the addition of a mechanical storage unit in the inventory room.

Associated building permit: BLD07-02486 Photronics Tool Facilitation Tenant Improvement - This tenant improvement permit is for the final installation and hookup of the fabrication tools for Photronics occupancy and operation. This permit is for final tool installation only and no building modifications are approved under this permit. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  7/17/2009 DONE
Taken to records for scanning.
INSP-Final Inspection6/10/20096/11/20096/11/2009APASS
DetailsForrest France
Corrections completed, fire alarm work passed final inspection.
INSP-Final Inspection6/8/20096/9/20096/9/2009PFAIL
DetailsForrest France
Operation of the smoke detector at the tool failed to initiate shunt trip power switch. Sprinkler tamper switch tested okay.
INSP-Conference1/26/20091/26/20092/2/2009PDONE
DetailsForrest France
FIR-Aging Inspection11/6/200811/6/200811/6/2008 DONE
DetailsForrest France
Work in progress
Inspection Record Card- Fire8/6/2008 8/6/2008 DONE
Details
Telephone call  8/6/2008 DONE
Details
t/c w andy sellers at ###-#### - permit ready and fees given
Permit Ready to Issue  8/6/2008 DONE
Details
Issue and Print Permit  8/6/2008 DONE
Plan assigned to (Stephanie)7/18/2008 8/5/2008 DONE
DetailsStephanie L. Cobbley
Alarm Plan Check  8/5/2008 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/5/2008 DONE
Miscellaneous action  8/4/2008 DONE
Information requested received
Telephone call  7/24/2008 DONE
Left a message for Andy letting him know that I need the information discussed by Monday, the 28th, I would need to deny the plans and have him resubmit.
Telephone call  7/21/2008 DONE
Spoke with Andy and asked him to provide a new riser and floorplan layout clouding the new devices. The current plans have several initiating devices clouded, but not all of them pertain to this permit scope. In addition, the permit app. gives a PE as the designer, therefore I asked Andy for a letter from the Engineer per Boise City Policy. Andy stated that he thought the 'designer' needed to be the original engineer. I clarified that the engineer is only to be listed as the 'designer' if he/she signs off on them that the drawings did not change for the original bid documents. If someone changed the engineer's design, then that person must be NICET certified or factory trained, and that it is that person that must be listed as the 'designer' on the permit app. He said he would get the information to me within a day or two.
Application received  7/18/2008