INSP-Final Inspection | 10/8/2008 | 10/8/2008 | 10/8/2008 | P | PASS |
Troy Cobbley
|
|
|
Corrections made per Forrest last inspection and forward flush completed. KR.
|
INSP-Final Inspection | 10/3/2008 | 10/6/2008 | 10/6/2008 | A | CANC |
Forrest France
|
|
|
Bruce Phone #: ###-####
|
Override - Parcel Holds | 10/3/2008 | 1/1/1900 | 10/3/2008 | | |
|
|
|
fir only
|
INSP-Sprinkler Rough-in | 9/23/2008 | 9/24/2008 | 9/24/2008 | A | PART |
Forrest France
|
|
|
Verified correction notice items are complete per last inspection, pendent heads at the paint mixing room are the correct type however plan legend indicates 286 deg. heads and 155 deg. heads have been installed. Also need to adjust deck insulation blocking one upright head prior to final. Office areas are okay for cover at the drop ceilings.
|
Override - Parcel Holds | 9/23/2008 | 1/1/1900 | 9/23/2008 | | |
|
|
|
not final
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2008 | 9/22/2008 | 9/22/2008 | P | FAIL |
Forrest France
|
|
|
OH rough-in failed due to missing SW head at an overhead door, blocked upright by deck insulation, incorrect head types at the paint storage and mixing room, overspaced pendent at the dry goods storage room, need to install flex couplings at the riser per key note #16 on plans. See annotations on stamped plan set.
|
INSP-Sprinkler Rough-in/Hydro | 9/16/2008 | 9/17/2008 | 9/17/2008 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic testing passed inspection, noted FDC is obstructed as installed by adjacent bollard at the garage door entrance. Need approved plans for rough-in inspection.
|
INSP-Sprinkler Rough-in/Hydro | 9/5/2008 | 9/8/2008 | 9/5/2008 | P | CANC |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|
Override - Parcel Holds | | | 8/1/2008 | | |
|
|
|
|
Issue and Print Permit | | | 8/1/2008 | | DONE |
|
|
|
|
Early Start | | | 7/23/2008 | | DONE |
|
|
|
Early Start request approved. Doc attached.
|
Sprinkler Plan Check | 7/18/2008 | | 7/23/2008 | | PASS |
|
|
|
Plans are approved w/conditions by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2008 | | DONE |
Cathy Brown
|
|
|
|
Override - Parcel Holds | | | 7/23/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 7/23/2008 | | 7/23/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 7/23/2008 | | DONE |
Cathy Brown
|
|
|
tlk to brook nelson ###-#### that permit and fees are ready to be picked up
|
Override - Parcel Holds | | | 7/23/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 7/23/2008 | | DONE |
Cathy Brown
|
|
|
|
Sprinkler Plan Check | 7/18/2008 | | 7/22/2008 | | NR |
|
|
|
This project has been put on hold pending project scope and occupancy verification. Please call me if you have any questions.
|
Application received | | | 7/18/2008 | | |
|
|
|
|
Pending Assignment by SAM | 7/18/2008 | | | | |
|
|
|
|