Miscellaneous action | | | 5/11/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 8/22/2008 | 8/22/2008 | 8/22/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. I had the technician change the zone label from the tenant name to the tenant address.
|
INSP-Final Inspection | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | FAIL |
Troy Cobbley
|
|
|
The sample tubes have been corrected but we could not test the duct smoke detector since the gas had not been piped to the hvac unit.
|
INSP-Final Inspection | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | FAIL |
Troy Cobbley
|
|
|
The new duct smoke detector had not been wired to the facp yet and the monitoring company had not been set up for the new zone. Also the plastic sample tube in the duct smoke detector needed to be removed and the steel tube put in its position. No inspection was performed for function.
|
Issue and Print Permit | | | 7/30/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 7/25/2008 | | 7/25/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/25/2008 | | DONE |
|
|
|
left vm for ken webster at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/25/2008 | | DONE |
|
|
|
|
Application received | | | 7/24/2008 | | |
|
|
|
|
Plan assigned to (Stephanie) | 7/24/2008 | | 7/24/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 7/24/2008 | | DONE |
|
|
|
Spoke to Ken Webster and asked him to fax or email me a data sheet for the existing fire alarm panel.
|
Alarm Plan Check | | | 7/24/2008 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2008 | | DONE |
|
|
|
|