Miscellaneous action | | | 5/11/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 9/16/2008 | 9/17/2008 | 9/17/2008 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm testing completed, all repairs made per last inspection. KR
|
INSP-Final Inspection | 9/15/2008 | 9/15/2008 | 9/15/2008 | P | FAIL |
Troy Cobbley
|
|
|
The alarm signals are silencing and restoring themselves. The phone lines and battery signals are ok.
|
INSP-Final Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | FAIL |
Troy Cobbley
|
|
|
There were no approved plans on site and after a discussion with the technician a resubmittal is in order due to the reconfiguration of the initiation devices into the new fire alarm panel. They had been submitted as reporting to the addressable loop but are not utilizing the hardwired zones.
|
Plan assigned to (Stephanie) | 7/24/2008 | | 7/31/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | | | 7/31/2008 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/31/2008 | | 7/31/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/31/2008 | | DONE |
|
|
|
left vm for ken webster at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/31/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/31/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/31/2008 | | DONE |
|
|
|
|
Application received | | | 7/24/2008 | | |
|
|
|
|