Miscellaneous action | | | 3/10/2009 | | DONE |
|
|
|
Sending for archiving
|
INSP-Final Inspection | 2/17/2009 | 2/19/2009 | 2/19/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Mike is following up on the expansion tank pre-charge.
|
INSP-Sprinkler Rough-in/Hydro | 1/2/2009 | 1/5/2009 | 1/6/2009 | A | PASS |
Troy Cobbley
|
|
|
The rough-in inspection for the existing area passed the two systems still need to be tied together. The overhead hydro test passed. The sprinkler piping is ok to cover.
|
INSP-Final Inspection | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PART |
Forrest France
|
|
|
Foward flush, connections to fire alarm panel have been tested. One sprinkler head in mechanical room blocked by light fixture.Missing sign on riser room door. KR
|
INSP-Conference | 10/20/2008 | 10/20/2008 | 10/20/2008 | P | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping in the sanctuary can be covered. The combustible concealed pockets have been filled with insulation.
|
CHANGE STATUS TO (ISS) | | | 10/20/2008 | | DONE |
|
|
|
Error was issued Final
|
INSP-Final Inspection | 10/17/2008 | 10/17/2008 | 10/17/2008 | P | FAIL |
Troy Cobbley
|
|
|
This project is not ready for a final yet. This inspection was only for a sprinkler rough-in. The sanctuary is ok to cover except for the north soffit. It did not have the insulation installed by the contractor yet.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2008 | | |
Cathy Brown
|
|
|
|
Telephone call | | | 10/17/2008 | | DONE |
Cathy Brown
|
|
|
tlk to lilly ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 10/17/2008 | | 10/17/2008 | | DONE |
Cathy Brown
|
|
|
|
(F) Reprint permit | | | 10/17/2008 | | DONE |
|
|
|
|
Issue Fee-Due permit | | | 10/17/2008 | | DONE |
|
|
|
re-issued from resubmittal
|
Sprinkler Plan Check | 10/6/2008 | | 10/16/2008 | | PASS |
|
|
|
Note: this was the third review. A total of 35 heads in the remote area of operation were affected as a result of this plan and calculation review. Plans are approved by Bryan Johnson
|
Sprinkler Plan Check | 10/6/2008 | | 10/11/2008 | | NR |
|
|
|
These plans have been place ON HOLD until further information has been provided by the sprinkler contractor. An expedient response from the sprinkler contractor would be appreciated.
|
Plan resubmittals received | | | 10/6/2008 | | |
|
|
|
Plan Modification; Recieved 5 copies of application binder of submittal info and plan sheets fp1 and fp2; taken to fire review.
|
INSP-Sprinkler Rough-in | 10/2/2008 | 10/3/2008 | 10/3/2008 | A | PART |
Troy Cobbley
|
|
|
I met John, the job superintendant, on site and gave the approval to cover the main east/west corridor. One upright sprinkler head still has not be centered as per the correction notice. John stated that he would leave an access for me to check this head later. He stated that the fire sprinkler contractor had contacted the city plan review and that they were waiting plans. I looked it up on the computer and could find no record of a resubmittal. John was going to followup with Shilo. The Sanctuary is not approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 9/17/2008 | 9/17/2008 | 9/18/2008 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed.
|
INSP-Sprinkler Rough-in | 9/12/2008 | 9/15/2008 | 9/15/2008 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for the locations of the deficiencies. They include flat faced bushings used in multiple locations which are not allowed per NFPA 13, sprinkler piping installed as 1" instead of the 1 1/4" as shown on the plans in the Sanctuary remote area, 11/4" piping installed where 1 1/2" piping is shown on the plans under the platform in the Sanctuary, the upright sprinkler heads located in the flat truss locations need to be centered in the truss space or aligned with the trusses as per NFPA 13, two upright sprinkler heads in the kitchen area are located too close to one another, the wron backflow preventor has been installed and 3" piping has been installed from the backflow preventor to the FDC tie in but the plans show 4", the riser detail shows 4" piping above the redi riser but 3" has been installed.
|
INSP-Sprinkler Rough-in | 9/5/2008 | 9/8/2008 | 9/8/2008 | A | FAIL |
Troy Cobbley
|
|
|
The inspection started and ended in the Sanctuary. The piping in the remote area is shown as 2" on the city approved plans. As installed the piping appears to be 1 1/4" or 1 1/2". Plans need to be resubmitted or the approved sized piping needs to be installed. I looked at the hydraulic calculations to verify actual pipe size but node points are missing on the plans and center to center lengths do not match. Similiarly a branchline on the north side of the building is shown to go from 1 1/4" in size to 1 1/2" then back to 1 1/4". I did not verify if it had been installed that way yet. Also lag bolts have been used to attach the earthquake braces to the structure which is not allowed per NFPA 13. From the floor it does not appear that the side sammy's supporting the main piping have not been mounted the required 3" minimum distance from the bottom of the cord. Also sprinkler protection is required in the area where the speakers will be mounted. The inspection was stopped at this point until all pipe sizing is verified and the earthquake bracing/hangers are addressed.
|
Inspection Record Card- Fire | 9/5/2008 | | 9/5/2008 | | DONE |
|
|
|
|
Telephone call | | | 9/5/2008 | | DONE |
|
|
|
left vm for lillie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/5/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/5/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/27/2008 | | 9/3/2008 | | PASS |
|
|
|
plans are approved
|
Plan resubmittals received | | | 8/27/2008 | | DONE |
Sam Rogers
|
|
|
|
Early Start | | | 8/18/2008 | | DONE |
|
|
|
Approved Early Start request. Doc Attached.
|
Sprinkler Plan Check | 7/24/2008 | | 8/7/2008 | | FAIL |
|
|
|
These plans were denied due to lack of or missing information. Upon request the denied set of plans may be retrieved from my office for salvage. The denied set of plans will be maintained for five working days.
|
Application received | | | 7/24/2008 | | |
|
|
|
|
Pending Assignment by SAM | 7/24/2008 | | | | |
|
|
|
|
Plan assigned to (SAM) | 10/6/2008 | | | | |
|
|
|
|