Permit Information
Permit NumberFIR08-00541
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 3604 S BANNER AVE
Project NameSTEVE CHRISTENSEN BLDG
Customer Number 
ePlanReview 
Description
Revised FIR Work Scope: 10/19/08
The contractor has submitted calculations and plans with modifications to include accurate plan revisions, notations and dates. The system design was modified during construction due to inaccurate original water flow information having been calculated. Among the modifications are pipe size and layout, new heads with a lower k-factor and a hard lid was added in the open area above the warehouse.
Revised FIR Work Scope: 09/29/08
The contractor has submitted plans with modifications to include pipe type changes to the mezzanine piping from steal to CPVC. The original head count has been changed to include additional heads. New total count is noted to be 163.
FIR Work Scope:
Beginning from an existing 6” supply flange located at the South end of the bldg. install a 4” wet riser and wet pipe system to serve through out the entire bldg. including the attic space. The system supply will be controlled from a wall post indicating valve. The system is designed to Ordinary Group II for shell protection of the Warehouse space and light hazard in the Office space.
The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-02372 & UG FITR08-00434.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/10/2009 DONE
Sending for archiving
INSP-Final Inspection1/21/20091/22/20091/22/2009APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/21/20091/21/20091/21/2009PFAIL
DetailsTroy Cobbley
The forward flush passed. Bruce needs to change the mixed temperature pendants to be all 155 degree except in locations as required
INSP-Final Inspection1/15/20091/16/20091/16/2009PCANC
DetailsTroy Cobbley
The project related fire alarm is not complete so bruce and I agreed to reschedule for next week.
Override - Parcel Holds1/15/20091/1/19001/15/2009  
does not apply
INSP-Sprinkler Rough-in10/24/200810/24/200810/24/2008PPASS
DetailsTroy Cobbley
The overhead sprinkler piping can be covered.
Issue and Print Permit  10/24/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/20/2008 DONE
Details
Telephone call  10/20/2008 DONE
Details
t/c w brook nelson at ###-#### - permit ready and fees given
Permit Ready to Issue  10/20/2008 DONE
Details
Inspection Record Card- Fire10/20/2008 10/20/2008 DONE
Details
Sprinkler Plan Check10/8/2008 10/19/2008 PASS
Details
plans are approved - Note: This was the third review of these modified plans and calculations. A total of 34 heads over 3 remote areas of operation were affected as a result of this review.
Plan resubmittals received  10/8/2008  
Received three copies of application, submittal info and plan sheets 1 of 2, 2 of 2; taken to Fire review
Sprinkler Plan Check9/15/2008 9/29/2008 FAIL
Details
These plans were denied due to lack of revision notes or references. Upon request, the denied set of plans may be retrieved for salvage. The denied set of plans will be maintained for 5 working days.
Plan resubmittals received  9/15/2008  
DetailsTisha Gallop
Plan Modification: Received four copies of application, submittal information, and sheet 1 of 2, 2 of 2; taken to fire review
INSP-Sprinkler Rough-in8/28/20088/29/20088/29/2008APART
DetailsTroy Cobbley
The above ground hydro test passed but the rough-in inspection failed due to cpvc piping being installed under the mezzanine instead of the steel piping as per the plans and hydraulic calculations.
INSP-Sprinkler Rough-in/Hydro8/28/20088/28/20088/28/2008PPASS
DetailsTroy Cobbley
The underground flush passed.
Issue and Print Permit  8/13/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/11/2008 DONE
DetailsCathy Brown
Inspection Record Card- Fire8/11/2008 8/11/2008 DONE
DetailsCathy Brown
Telephone call  8/11/2008 DONE
DetailsCathy Brown
tlk to brook nelson ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  8/11/2008 DONE
DetailsCathy Brown
Sprinkler Plan Check7/30/2008 8/9/2008 PASS
Details
Plans & Calculations are approved by Bryan Johnson
Early Start  8/5/2008 DONE
Approved Early start request to install sprinkler piping only below the mezanine. Doc attached.
Application received  7/30/2008  
Pending Assignment by SAM7/30/2008    
DetailsSam Rogers
Plan assigned to (SAM)7/30/2008    
Plan assigned to (SAM)9/15/2008    
DetailsSam Rogers