INSP-Final Inspection | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Forrest France
|
|
|
Remainder of work per permit scope completed, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 8/27/2008 | 8/27/2008 | 8/27/2008 | P | PART |
Forrest France
|
|
|
Approved installation at the men's restroom and adjacent mech. closet only, womens restroom is not yet complete (in Grape Escape tenat space - see subsequently created FIR08-00567 for further details).
|
INSP-Sprinkler Rough-in/Hydro | 8/15/2008 | 8/15/2008 | 8/15/2008 | A | FAIL |
Forrest France
|
|
|
Provide plans reflecting the installation of upright protection above the ceilings at the east side.
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2008 | 8/14/2008 | 8/15/2008 | P | FAIL |
Forrest France
|
|
|
Exposed wood construction above the ceilings at the pendent heads will need coverage as discussed.
|
Sprinkler Plan Check | 8/4/2008 | | 8/4/2008 | | PASS |
Scott Arellano
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/4/2008 | | 8/4/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 8/4/2008 | | DONE |
Cathy Brown
|
|
|
lft ms with receceptionist for shaun ramsey ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/4/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 8/4/2008 | | DONE |
|
|
|
|
Application received | | | 8/1/2008 | | |
|
|
|
|
Pending Assignment by SAM | 8/1/2008 | | | | |
|
|
|
|