Permit VOIDED | 9/13/2018 | 9/13/2018 | 9/13/2018 | | DONE |
Brittany Hill
|
|
|
Jeremy berg, they did not do the work. Lee stated to him to call in and have the permit voided
|
Miscellaneous action | | | 9/10/2018 | | DONE |
|
|
|
Emailed Jeremy Berg to get an update. Asked him to schedule an acceptance test if work has been completed.
|
FIR-Aging Inspection | 4/25/2018 | 4/25/2018 | 4/27/2018 | | NR |
Troy Cobbley
|
|
|
This permit will need to be voided due to another contractor is taken over the work.
|
FIR-Aging Inspection | 9/25/2017 | 9/25/2017 | 9/25/2017 | | NR |
Troy Cobbley
|
|
|
Waiting for fire dept. follow up and contractor to call for final inspection
|
FIR-Aging Inspection | 5/8/2017 | 5/8/2017 | 5/8/2017 | | NR |
Troy Cobbley
|
|
|
Waiting on fire dept follow up
|
FIR-Aging Inspection | 10/26/2016 | 10/26/2016 | 11/1/2016 | | NR |
Troy Cobbley
|
|
|
I turned this over to the fire dept for follow up
|
FIR-Aging Inspection | 7/27/2016 | 7/27/2016 | 7/27/2016 | | NR |
Troy Cobbley
|
|
|
I spoke to Assistant Chief Ron Johnson about a previous request for help.
|
INSP-Conference | 3/11/2016 | 3/11/2016 | 3/11/2016 | P | DONE |
Troy Cobbley
|
|
|
Wendy contacted me and stated that Peak Alarm is no longer in a business arrangement with the building owner. I spoke to Scott and have forwarded information to Chief Gervais with the Fire Dept.
|
FIR-Aging Inspection | 3/7/2016 | 3/7/2016 | 3/11/2016 | | NR |
Troy Cobbley
|
|
|
I left a voice message for Wendy the Office Manager requesting that the project be finished up.
|
INSP-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | FAIL |
Troy Cobbley
|
|
|
Began inspection by verifying the sync of the audio/visual devices. When testing the horns on most of the first floor and the west half of the second floor failed to work. Inspection stopped and no devices tested.
|
FIR-Aging Inspection | 10/28/2013 | 10/28/2013 | 10/29/2013 | | NR |
Troy Cobbley
|
|
|
I left message for Mike requesting project status
|
FIR-Aging Inspection | 9/4/2012 | 9/4/2012 | 9/12/2012 | | NR |
Troy Cobbley
|
|
|
I spoke to Jason and Mike and they were going to follow up on this project.
|
INSP-Final Inspection | 4/18/2011 | 4/20/2011 | 4/20/2011 | P | FAIL |
Troy Cobbley
|
|
|
Neither the strobes or the horn were syncronized. Also need to test all initiating devices. Candella needs to be modified to 110cd on the strobe in the old engineering office. End of Line voltage was verified ok as well as spacing of the manual pull stations and audio/visual devices. Netcon was also verified at 5.
|
FIR-Aging Inspection | 4/18/2011 | 4/18/2011 | 4/19/2011 | | NR |
Troy Cobbley
|
|
|
wip
|
INSP-Final Inspection | 2/3/2011 | 2/4/2011 | 2/4/2011 | P | CANC |
Troy Cobbley
|
|
|
Per Mike madsen and my discussion this inspection will be rescheduled for next week.
|
FIR-Aging Inspection | 1/17/2011 | 1/17/2011 | 1/24/2011 | | NR |
Troy Cobbley
|
|
|
wip
|
FIR-Aging Inspection | 11/15/2010 | 11/15/2010 | 11/17/2010 | | NR |
Troy Cobbley
|
|
|
Mike stated that this should be set up for inspection the week after Thanksgiving.
|
Telephone call | | | 5/11/2010 | | DONE |
|
|
|
Peak Alarm called to let us know they haven't called for an inspection yet because they are trying to obtain an acceptable NETCON rating.
|
Telephone call | | | 4/19/2010 | | DONE |
|
|
|
Spoke to Mike regarding the project status. He will be calling in for a final inspection on 4/28/10.
|
CHANGE STATUS TO (ISS) | | | 8/7/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/7/2009 | | DONE |
|
|
|
|
Alarm Plan Check | 8/6/2009 | | 8/6/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
See review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 8/6/2009 | | DONE |
|
|
|
Approved plans and calcs available at front counter
|
Telephone call | | | 8/6/2009 | | DONE |
|
|
|
left message w richard for rodney at ###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 8/6/2009 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 7/31/2009 | | 8/6/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
8/6/2009 09:30:23 SLC - activity updated through activity FIRA24 from case FIR08-00550.
|
1st review completed | | | 8/3/2009 | | DONE |
|
|
|
|
Alarm Plan Check | 8/3/2009 | | 8/3/2009 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans did not accurately reflect field modifications. I called Mary F. to explain the discrepencies. She let me know she did not recieve the correct information from the field and will resubmit as soon as possible.
|
Plan resubmittals received | | | 8/3/2009 | | |
Tisha Gallop
|
|
|
received two copies of small documents, plan sheets FA-00, FA-22, FA-30, three copies of FA-21, one copy of FA-20; taken to fire review
|
Plan resubmittals received | | | 7/31/2009 | | |
Tisha Gallop
|
|
|
Plan Modification: received application, submittal documents and two copies of sheets FA-00, FA-20, FA-21, FA-22, FA-30; taken to fire review
|
INSP-Final Inspection | 4/1/2009 | 4/2/2009 | 4/2/2009 | A | FAIL |
Troy Cobbley
|
|
|
Plans need to be resubmitted for "plan modifications". This is due to extensive audio/visual modifications required such as additional devices, relocated devices and devices that need the candella adjusted brighter. Also the second floor tenant "ABC Channell 6" has a door magnet securing the exit door. The fire alarm contractor and I spoke about minimum sound requirements in the radio transmission rooms where only strobes had been installed and for all rooms. No devices were actually tested. An EOL had to be relocated in the NAC panel so that it would report a trouble
|
Telephone call | | | 3/24/2009 | | DONE |
|
|
|
Left a message for Rodney at Peak Alarm asking for the status of this project.
|
Telephone call | | | 3/24/2009 | | DONE |
|
|
|
Rodney with Peak Alarm called to let us know he will be calling in for an inspection this week.
|
INSP-Conference | 1/12/2009 | 1/12/2009 | 1/12/2009 | P | DONE |
Troy Cobbley
|
|
|
I left a message for Mark Cleverly with Thornton Ovliver that we were assured on 12/8/08 the alarm system installation would proceed. I visited the job site and found the alarm system still not functional and the building occupied. I contacted Mike with Peak Alarm and he stated that they would have the PIV connected today and then they would be waiting on phone lines and the elevator. Per the elevator contractor they are atleast three week out. I told Mike that the fire alarm system needs to be up and running. He was going to contact his boss and verify when phone lines would be installed.
|
Telephone call | | | 12/12/2008 | | DONE |
|
|
|
telcon from David, at Mackay Eclec, requesting approval for them to install conduit for the fire alarm system under this permit. I indicated they can, if they are subcontracted with Peak alarm to do the work and the work is specifically included under the plans issued with this permit.
|
Telephone call | | | 12/2/2008 | | DONE |
|
|
|
Telcon today with Karen Thomas, Thorton Oliver Keller, (###-####). She indicates they were waiting for elevator upgrades to be completed, but they have been postedponed to January. She has therefore made arrangements with the fire alarm contractor to begin work installing the fire alarm system on Monday, 12/8. All components are reportedly in stock for the installation to begin.
|
FIR-Aging Inspection | 11/26/2008 | 11/26/2008 | 12/1/2008 | | NR |
Troy Cobbley
|
|
|
I contacted peak alarm and they said that they would be on the job at the end of December or January as per their contact. I said "so this building has a non-functioning fire alarm system?" And they said yes.
I have forwarded this information to sam rogers and mark sentenno for further action.
|
Issue and Print Permit | | | 8/27/2008 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 8/5/2008 | | 8/12/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | | | 8/12/2008 | | PASS |
|
|
|
See redlined drawings and review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/12/2008 | | 8/12/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/12/2008 | | DONE |
|
|
|
|
Telephone call | | | 8/12/2008 | | DONE |
|
|
|
t/c w rodney larkey at ###-#### - permit ready and fees given
|
Application received | | | 8/5/2008 | | |
|
|
|
|
Case Summary | | | 8/5/2008 | | DONE |
|
|
|
|