DOC - Permit Finaled | | | 8/7/2009 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 8/19/2008 | 8/20/2008 | 8/20/2008 | P | PASS |
Troy Cobbley
|
|
|
The two additional upright heads have been added both restroom sprinkler piping can be covered.
|
INSP-Final Inspection | 8/19/2008 | 8/19/2008 | 8/20/2008 | A | PASS |
Sam Rogers
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | FAIL |
Troy Cobbley
|
|
|
Additional upright protection is required along the duct work in the south restroom. The north restroom is ok to cover.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2008 | | DONE |
Cathy Brown
|
|
|
|
Permit Ready to Issue | | | 8/15/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 8/15/2008 | | 8/15/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 8/15/2008 | | DONE |
Cathy Brown
|
|
|
tlk to jim danes ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 8/15/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/12/2008 | | 8/14/2008 | | PASS |
|
|
|
Quick permit by Bryan Johnson
|
Application received | | | 8/12/2008 | | |
|
|
|
|
Pending Assignment by SAM | 8/12/2008 | | | | |
Sam Rogers
|
|
|
|