Permit Information
Permit NumberFIR08-00567
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 800 W IDAHO ST
Project NameTHE MODE BLDG
Customer Number 
ePlanReview 
Description
Adding sprinker heads in remodeled Grape Escape space - (adding a second floor ceiling above Grape Escape, new hallway leading to new restrooms within expanded Grape Escape space).
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/30/20091/30/20091/30/2009PPASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in/Hydro1/30/20091/30/20091/30/2009PPASS
DetailsForrest France
Corrections field verified, inspection passed.
INSP-Sprinkler Rough-in/Hydro1/28/20091/29/20091/29/2009AFAIL
DetailsForrest France
New sidewall head at the stairway landing is installed beyond the lowest dimension below the deck per head listing, added upright at the storage room does not match response type or temp. with the adjacent head in the same fire area.
Miscellaneous action  9/5/2008 DONE
this permit was created to track with a newly created Grape Escape TI building permit. (work previoulsy was included under the building shell permit BLD08-01464)
INSP-Sprinkler Rough-in8/28/20088/28/20088/28/2008APART
DetailsForrest France
See plan annotations for locations inspected to date.
INSP-Sprinkler Rough-in8/27/20088/27/20088/27/2008PPART
DetailsForrest France
Locations on approved plan marked okayed with today's date including the restrooms and storage closet. Approved installation at the men's restroom and adjacent mech. closet only, womens restroom is not yet complete (in Grape Escape tenat space).
INSP-Sprinkler Rough-in/Hydro8/15/20088/15/20088/15/2008PPART
DetailsTroy Cobbley
No hydrostatic test required. One upright head found to be overspaced in Grape Escape was corrected while I waited. The high temperature upright, to be located infront of the hood, in the Pie Hole will not be installed until Monday. Per Sam Rogers, it is approved for both the restaurants to open at this time, with the commitment from the sprinkler contractor that the additional head in the Pie Hole will be installed early next week. The sprinkler work shown out side of the restraunts is not done yet. All construction work was submitted and approved under a "shell" building permit. Sprinkler rough-in piping in the newly roughed in restroom in Pie Hole wukk not provide protection above the proposed level of future ceiling. This needs to be resolved before the "final" of this sprinkler permit.
Pending Assignment by SAM8/14/2008 8/15/2008 DONE
DetailsSam Rogers
Plan submitted as a Quick permit but falls outside the guidelines. Agreed to rush the review for Randy, at Debest. Faxed plan to B. Johnson for review this morning.
Sprinkler Plan Check8/14/2008 8/15/2008 PASS
Details
PLANS DONE BY BRYAN JOHNSON
PLANS/APPL TAKEN TO FRONT DESK  8/15/2008 DONE
DetailsCathy Brown
Permit Ready to Issue  8/15/2008 DONE
Inspection Record Card- Fire8/15/2008 8/15/2008 DONE
DetailsCathy Brown
Inspection Record Card- Fire8/15/2008 8/15/2008 DONE
DetailsCathy Brown
Issue and Print Permit  8/15/2008 DONE
Application received  8/14/2008