Miscellaneous action | | | 3/10/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Conference | 1/7/2009 | 1/7/2009 | 1/7/2009 | P | DONE |
Troy Cobbley
|
|
|
I spoke to Brian Johnson and to Andy, the builder, about the PIV that was shown to be installed on the overhead sprinkler plans has not been installed. Per the separate underground permit FIR08-00514 no PIV was being installed. The PIV needs to be installed, a wall PIV approved by the city of boise installed or the one hour room with exterior access provided. Brian stated that he would contact me with a solution.
|
INSP-Sprinkler Rough-in | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | FAIL |
Forrest France
|
|
|
Wrong permit number request, intended for Tenant Improvement work.
|
INSP-Sprinkler Rough-in | 11/13/2008 | 11/14/2008 | 11/14/2008 | A | PART |
Forrest France
|
|
|
Reinspection for adjusted upright head locations in the truss webs at the roof deck passed. Noted three non-sprinklered concealed spaces at the SW round- locations marked on plans- in need of coverage or meet exceptions per NFPA.
|
INSP-Sprinkler Rough-in | 11/12/2008 | 11/14/2008 | 11/13/2008 | A | CANC |
Troy Cobbley
|
|
|
Your contact is Richard. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | PASS |
Troy Cobbley
|
|
|
The east exterior canopy can be covered now that the piping type and sizing has been corrected.
|
INSP-Sprinkler Rough-in/Hydro | 10/31/2008 | 11/3/2008 | 11/3/2008 | A | PASS |
Troy Cobbley
|
|
|
Above ground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/29/2008 | 10/31/2008 | 10/31/2008 | A | CANC |
Troy Cobbley
|
|
|
Per Charles the hydro test is to be cancelled.
|
INSP-Sprinkler Rough-in | 10/30/2008 | 10/31/2008 | 10/31/2008 | A | PART |
Troy Cobbley
|
|
|
The southwest canopy can be covered. The east canopy can not be covered due to cpvc piping being installed where as the plans indicate steel piping is to be installed. Plans either need to be resubmitted or piping is to be installed as per the plans. Also the upright sprinkler heads through out the rest of the building have not been installed as per NFPA 13 8.6.5.2.1.6 and exhibit 8.20. The general contractor also stated that he would install insulation in the eaves of the tower located on the southwest corner of the building. This space is considered a combustible concealed space.
|
INSP-Sprinkler Rough-in | 10/29/2008 | 10/30/2008 | 10/30/2008 | P | NR |
Forrest France
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/29/2008 | | 10/29/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 10/29/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/29/2008 | | DONE |
|
|
|
tlk to lilly that permit is ready to be picked up
|
Sprinkler Plan Check | 10/17/2008 | | 10/28/2008 | | PASS |
|
|
|
Note: this was the third review of these plans. 26 heads over three remote areas of operation were affect as a result of this plan review. Plans are approved by Bryan Johnson
|
Plan resubmittals received | | | 10/17/2008 | | DONE |
|
|
|
Received 5 resubmittal applications, and 5 copies of sheets FPI OF 3, PP2 OF 3, FP3 OF 3 SENT TO FIRE
|
Miscellaneous action | | | 10/13/2008 | | DONE |
|
|
|
Troy Cobbley reported that during the underground inspection today, the overhead sprinkler piping was observed to be mostly installed; installation deficiencies were also apparent. He advised Randy Knudson that a stop work order will be posted and a double fee will apply to the permit when issued.
|
Sprinkler Plan Check | 9/23/2008 | | 9/27/2008 | | FAIL |
|
|
|
These plans were denied. The plans and calculations did not correlate and the selected heads for use in the Dining Room were not listed for the application.
Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set will be maintained for 5 working days.
|
Sprinkler Plan Check | 9/21/2008 | | 9/23/2008 | | NR |
|
|
|
Spectrum plans are on hold pending further information from the contractor.
|
Plan resubmittals received | | | 9/12/2008 | | |
|
|
|
received "5" sets of plans with an application for each set. put plans on fire shelf
|
Sprinkler Plan Check | 8/21/2008 | | 9/1/2008 | | FAIL |
|
|
|
These plans were denied due to a material listing discrepancy. Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set will be maintained for 5 working days.
|
Case Summary | | | 8/21/2008 | | DONE |
Marsha Smylie
|
|
|
|
Application received | | | 8/21/2008 | | |
Marsha Smylie
|
|
|
|
Pending Assignment by SAM | 8/21/2008 | | | | |
Sam Rogers
|
|
|
|