Permit Information
Permit NumberFIR08-00596
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 802 W IDAHO ST
Project Name 
Customer Number 
ePlanReview 
Description
Modified FIR OH Work Scope: 10/28/08
The fire sprinkler scope consists of modifying the existing wet pipe system on the first and second floors by adding heads where required and changing out other non listed heads with the correct application. Plans and supporting calculations have been submitted. The existing riser will not be affected within this scope of work.
Original FIR OH Work Scope:
The fire sprinkler scope consists of modifying the existing wet pipe system by adding heads where required by code to meet spacing requirements.
The fire sprinkler system alterations / work shall comply with the IFC 2006 & NFPA 13, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD08-01775.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/11/2009 DONE
Sent for archiving
INSP-Final Inspection11/4/200811/4/200811/5/2008PPASS
DetailsForrest France
Fire sprinkler permit passed final inspection.
INSP-Sprinkler Rough-in/Hydro11/3/200811/4/200811/4/2008APART
DetailsForrest France
OH fire sprinkler system modifications completed acceptable per the scope of work, noted one leak repaired while on site, one existing non-compliant head at the 2nd floor to be removed prior to final.
INSP-Sprinkler Rough-in/Hydro11/3/200811/3/200811/3/2008PPART
DetailsForrest France
Okay for cover at the 2nd floor office room ceiling.
INSP-Sprinkler Rough-in/Hydro10/30/200810/30/200810/30/2008PPART
DetailsForrest France
Sprinkler installation at the 2nd floor hard lid ceiling above the stairway is approved for cover, minor adjustments made while on site, see plans for locations okayed wtih todays date.
PLANS/APPL TAKEN TO FRONT DESK  10/30/2008 DONE
DetailsCathy Brown
Override - Parcel Holds  10/30/2008  
Inspection Record Card- Fire10/30/2008 10/30/2008 DONE
DetailsCathy Brown
Telephone call  10/30/2008 DONE
DetailsCathy Brown
lft vm with gerald ebeling ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  10/30/2008 DONE
DetailsCathy Brown
Issue and Print Permit  10/30/2008 DONE
DetailsAlexandra L. DeYoung
Sprinkler Plan Check10/21/2008 10/28/2008 PASS
Details
Plans are approved by Bryan Johnson
Telephone call  10/21/2008 DONE
Telcon from Brett, ESI, requesting approval to pay B. Johnson to expedite the plan modifications plans they submitted today. I explained that in order to maintain equitable service to all customers, we do not allow contractors to pay our plan reviewers on the side, to expedite their plans. I also explained we have 2 plans which are 2 days beyond our standard 10-day review period, as well as 7 other plans in line, which we need to serve fairly. I indicated we would certainly review their plans as soon as possible, and if the work load allows, it will be done in less than the 2-week standard.
Plan resubmittals received  10/21/2008  
DetailsBarbara Stitt
Telephone call  9/23/2008 DONE
Telcon from Gerald Eberling, DeBest (###-####) requesting a meeting with the City to discuss possible re-design options which would not require hydraulic calculations. I declined, since our AHJ authority is only to approve plans for Code compliance, not to make design recommendation.. He indicated they now have plans of the existing system, but the owner did not want to pay DeBest to input the existing system data into their calc program and run the calculations. I suggested if they could show the modified area is upstream of the originally calc'd most remote area, and they are only adding additional gridded mains which would improve the hydraulic performance of the most remote area, it might be possible to only calc the modified area back to the riser, and avoid recalculating the entire system again. He indicated he would investigate possibility and call me back.
Sprinkler Plan Check8/22/2008 8/28/2008 FAIL
Details
These plans were denied due to a sprinkler head listing discrepancy. Upon request the denied set of plans may be received from my office for salvage. The denied set of plans will be maintained for 5 working days.
Bryan Johnson
Application received  8/22/2008  
Pending Assignment by SAM8/22/2008    
DetailsSam Rogers
Outsouced to johnson Consulting.