INSP-Final Inspection | 10/6/2008 | 10/6/2008 | 10/6/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit final inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/15/2008 | 9/15/2008 | 9/15/2008 | A | PART |
Forrest France
|
|
|
See stamped plan set for locations approved to date.
|
INSP-Sprinkler Rough-in | 9/11/2008 | 9/11/2008 | 9/11/2008 | P | PART |
Forrest France
|
|
|
Overhead installation at the grid ceiling is good for cover, atrium work is not finished.
|
INSP-Sprinkler Rough-in | 8/29/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Forrest France
|
|
|
Fire sprinkler work above hard lid ceilings is approved for cover, atrium and grid ceiling sprinkler work is not yet complete.
|
INSP-Sprinkler Rough-in | 8/29/2008 | 9/2/2008 | 9/2/2008 | A | PART |
Forrest France
|
|
|
OH fire sprinkler system modifications are okay for cover at the womens and mens locker room sheetrock ceiling areas-circled and initialed on stamped plans with today's date, also verified coverage outside remodel area due to new wall construction is compliant.
|
Inspection Record Card- Fire | 8/25/2008 | | 8/25/2008 | | DONE |
|
|
|
|
Telephone call | | | 8/25/2008 | | DONE |
|
|
|
t/c w brodie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 8/25/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/25/2008 | | DONE |
|
|
|
|
Application received | | | 8/22/2008 | | |
|
|
|
|
Case Summary | | | 8/22/2008 | | |
|
|
|
|
Sprinkler Plan Check | 8/22/2008 | | 8/22/2008 | | PASS |
Scott Arellano
|
|
|
Plans approved. No seperate attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2008 | | DONE |
|
|
|
|
Pending Assignment by SAM | 8/22/2008 | | | | |
Sam Rogers
|
|
|
|