Permit Information
Permit NumberFIR08-00602
StatusFinaled
Name DOHERTY ELECTRIC
Site Address 400 N BENJAMIN LN
Project NameADA COUNTY-BENJAMIN PHASE 1
Customer Number 
ePlanReview 
Description
This fire alarm permit is to add notification, pull stations, and smoke detectors to the existing fire alarm system for phase 1. This permit scope does not include elevator recall, as that will be done during phase 2 and shall require a separate fire alarm permit.

PLAN MODIFICATION 12-11-08 - NOTE: Drawings resubmitted for this plan modification are to be IN ADDITION TO the approved set dated 8-25-08, not a replacement of.
Racks were added to the building blocking some of the visual device locations in employee work areas. The contractor has opted to utilize the IFC 2006 code allowance for employee work areas that states:
"907.10.1.2 Employee work areas.
Where employee work areas have audible alarm coverage, the notification appliance circuits serving the employee work areas shall be initially designed with a minimum of 20 percent spare capacity to account for the potential of adding visible notification appliances in the future to accommodate hearing impaired employee(s)."
Audibility requirements in the areas shall be met and will be field verified.
Original review comments are still subject to field verification.

Associated building permit: BLD08-01168 (ADA COUNTY BENJAMIN CAMPUS - PHASE I) To remodel an existing 89,534 square foot warehouse/office building in phases. Phase I will include 41,700 square feet of the east side of the building. Work to include: [installation of new non-bearing interior partition walls to create, two accessible restrooms on the first floor (four stalls in the women's and two stalls w/ two urinals in the men's room), two accessible restrooms on the second floor (five stalls in the women's and three stalls w/ two urinals in the men's), separate sex accessible U/A rooms, elections area, two training room, open office area, meeting room, five new offices, five group rooms, two break rooms,] new three hour wall extension, new lighting, new plumbing, new doors in specified locations, new exit stairs (not enclosed), installation of suspended ceiling system, installation of new mechanical system (grilles, diffusers, ductwork, and new units), miscellaneous related interior finishes, demo of existing metal lean to at the back of the building and accessible parking w/curb cuts at the front of the building. This building is fully fire sprinklered any alterations to the sprinkler system shall be maintained per NFPA #13 as regulated by the fire department. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. A separate permit is required if any racks over eight feet are installed. This phase will be given a Temporary Certificate of Occupancy until phase II is completed then a Certificate of Occupancy will be issued to the entire building.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  5/11/2009 DONE
Plans taken to records to scan
INSP-Final Inspection12/11/200812/12/200812/12/2008APASS
DetailsTroy Cobbley
permit finaled
Alarm Plan Check  12/11/2008 PASS
Plan modification. See redlined drawings and review comments
PLANS/APPL TAKEN TO FRONT DESK  12/11/2008 DONE
Inspection Record Card- Fire12/11/2008 12/11/2008 DONE
Details
Telephone call  12/11/2008 DONE
Details
t/c w mike at ###-#### - permit ready and no fees due
Permit Ready to Issue  12/11/2008 DONE
CHANGE STATUS TO (ISS)  12/11/2008 DONE
DetailsAlexandra L. DeYoung
Case Summary  12/11/2008 DONE
DetailsAlexandra L. DeYoung
(F) Reprint permit  12/10/2008 DONE
Plan assigned to (Stephanie)12/10/2008 12/10/2008 DONE
DetailsStephanie L. Cobbley
Telephone call  12/5/2008 DONE
Spoke to Tyler with Eidam and Associates regarding areas in the building that do not require visual notification. I explained that in employee work areas (not including breakrooms, bathrooms etc..) that visual devices are not required as long as audibility requirements have been met and as long as the circuit has expansion capabilities to add a strobe should a hearing impaired person become an employee. Also discussed were storage areas. I told him that code does not require visual notification in storage areas. We also discussed the 2nd floor 'future expansion' area. He said there were existing devices in that area that do not work and wanted to know if he should remove them or replace them. I told him as long as that space was not being occupied or used, he could remove the devices in that space with the understanding that a new FIR permit will need to be pulled in order to occupy that area.
INSP-Final Inspection12/3/200812/4/200812/4/2008AFAIL
DetailsTroy Cobbley
Provide test reports, get decision from sam rogers on the "future expansion" on the second floor (no notification is functional), and provide modifications as required due to the strobes being blocked on the first floor due to shelving.
FIR-Aging Inspection12/1/200812/1/200812/4/2008 CANC
DetailsTroy Cobbley
INSP-Final Inspection12/3/200812/3/200812/3/2008PCANC
DetailsTroy Cobbley
Due to limited time, the inspection turned into a conference. We are going to meet in the morning at 8:00am to begin the inspection.
Issue and Print Permit  8/29/2008 DONE
Alarm Plan Check  8/28/2008 PASS
See redlines and review comments
PLANS/APPL TAKEN TO FRONT DESK  8/28/2008 DONE
Inspection Record Card- Fire8/28/2008 8/28/2008 DONE
Details
Telephone call  8/28/2008 DONE
Details
t/c w mike bayse at ###-#### - permit ready and fees given
Permit Ready to Issue  8/28/2008 DONE
Details
Application received  8/26/2008  
Plan assigned to (Stephanie)8/26/2008 8/26/2008 DONE
DetailsStephanie L. Cobbley
Case Summary  8/26/2008 DONE