Telephone call | | | 8/3/2012 | | DONE |
|
|
|
Sean with Rocky Mountain Electric called. He said they have lost the as-built sets and was hoping to get a copy from me. I explained that since the permit has been finaled, and per records they've been taken to records for scanning, that he would need to contact Records and follow their procedure for getting copies of documents. I gave him the phone number and transfered him.
|
Miscellaneous action | | | 1/20/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | A | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Alarm Testing | 12/14/2011 | 12/15/2011 | 12/15/2011 | A | PART |
Forrest France
|
|
|
Completed elevator testing at builidngs 2 and 3, finished dry system riser supervision testing, DH and DD re-checked, panel items and offsite monitoring including account information verified, previous correction items retested. Final pending points map at the panel and record of completion forms.
|
INSP-Alarm Testing | 12/9/2011 | 12/12/2011 | 12/12/2011 | P | CANC |
Troy Cobbley
|
|
|
Cancelled due to time constraints.
|
INSP-Alarm Testing | 12/8/2011 | 12/9/2011 | 12/9/2011 | A | PART |
Forrest France
|
|
|
Correction items noted today include DH at building #2, three PS at the main riser, dampers at building 2 and 3 parking garage, inaccurate one line for initiating device point numbers. All SD and HD at building 1 and 4 tested okay, relocated trash chute heats at buildings 2 and 3 also tested okay.
|
INSP-Alarm Testing | 12/7/2011 | 12/7/2011 | 12/7/2011 | P | NR |
Forrest France
|
|
|
Low air pressure switches at dry systems not set, DH did not release, noted 4th floor dry system LAPS activated a general alarm condition.
|
INSP-Alarm Testing | 12/5/2011 | 12/6/2011 | 12/7/2011 | P | PART |
Forrest France
|
|
|
Completed fire sprinkler system monitoring test at both buildings # 2 and 3 throughout, verified previous corrections, noted items include; 7 PS at dry systems not set, inconsistent address/descriptors, DH at some levels failed to drop or reset, missing revised plan sheets for the 1st floor.
|
INSP-Alarm Testing | 12/2/2011 | 12/5/2011 | 12/5/2011 | A | PART |
Forrest France
|
|
|
Completed notification testing at building 1 garage, building 2 and 3 garages including 1st -4th floors and building 4 garage. Verified previous correction items and repairs at buildings 2 and 3, record drawings for field changes finished with the exception of the first floor levels. Noted items today include one non-functional av at the 2nd floor #3 corridor, insufficient dB at resident storage bldg. #3, dB levels at the finished model units are not adequate, DH at elevator lobbies building #2 did not release. Discussed schedule and items for next test date.
|
INSP-Alarm Testing | 11/28/2011 | 11/29/2011 | 11/29/2011 | A | PART |
Forrest France
|
|
|
|
INSP-Alarm Testing | 11/28/2011 | 11/29/2011 | 11/29/2011 | A | PART |
Forrest France
|
|
|
Completed initial walkthrough for scope of work at parking garages in buildings 1 and 4, and building 3 basement thru 4th floor. Also completed second walkthrough of building 2 after noted corrections made. See plan set for marked locations and annotations regarding today's inspection notes.
|
INSP-Alarm Testing | 11/27/2011 | 11/28/2011 | 11/28/2011 | A | PART |
Forrest France
|
|
|
|
INSP-Alarm Testing | 11/10/2011 | 11/14/2011 | 11/14/2011 | A | PART |
Forrest France
|
|
|
Walkthrough completed for building #2- see plan annotations and review comments for locations and descriptions of items to be amended including appliance locations, notification coverage, etc.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2011 | 11/10/2011 | 11/9/2011 | P | DEFR |
Forrest France
|
|
|
Rob Ahten Protex Phone #: ###-#### >> Inspection requested via web by Sean DeLacy
|
INSP-Final Inspection | 11/7/2011 | 11/9/2011 | 11/9/2011 | P | NR |
Forrest France
|
|
|
Rob Ahten Protex Phone #: ###-#### >> Inspection requested via web by Sean DeLacy
|
CHANGE STATUS TO (ISS) | | | 11/2/2011 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary | | | 11/2/2011 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 11/2/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 10/26/2011 | | 11/1/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 11/1/2011 | | 11/1/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 11/1/2011 | | DONE |
|
|
|
Approved redlined plan modification documents available at front counter.
|
Inspection Record Card- Fire | 11/1/2011 | | 11/1/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/1/2011 | | DONE |
|
|
|
left message for sean - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 11/1/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/26/2011 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: Received application, two copies of submittal folder and plans; routed to Fire Review.
|
INSP-Conference | 6/27/2011 | 6/27/2011 | 6/28/2011 | P | DONE |
Forrest France
|
|
|
Regarding plan modifications.
|
Issue and Print Permit | | | 6/22/2011 | | DONE |
|
|
|
|
1st review completed | | | 6/21/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 6/21/2011 | | 6/21/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 6/21/2011 | | DONE |
|
|
|
approved redlined plans available at front counter.
|
Inspection Record Card- Fire | 6/21/2011 | | 6/21/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 6/21/2011 | | DONE |
|
|
|
t/c w hedi - permit ready and fees given
|
Permit Ready to Issue | | | 6/21/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 6/14/2011 | | 6/21/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Plan resubmittals received | | | 6/14/2011 | | |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 3/18/2011 | | DONE |
|
|
|
Spoke to Rob Ahten with Protex. He stated that he may be re-submitting the rejected plans soon and wanted to know if the policy regarding review fees would fall under the current requirements or the original requirements. The review fee policy at the time of the original permit were that the fire alarm review fees were incorporated into the building permit fees for new buildings and structures. I let him know that we would uphold that original policy since the building permit had not been expired and is still in the issued status.
|
Alarm Plan Check | | | 9/4/2008 | | FAIL |
|
|
|
See redlined plans and review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2008 | | DONE |
|
|
|
Redlined drawings available for contractor pick up
|
Telephone call | | | 9/4/2008 | | DONE |
|
|
|
Called Rob Ahten to ask who he'd like the review comments faxed to. He asked me to fax them to him and he would disperse them.
|
Miscellaneous action | | | 9/4/2008 | | DONE |
|
|
|
Faxed review comments to Rob Ahten
|
Application received | | | 8/26/2008 | | |
|
|
|
|
Plan assigned to (Stephanie) | 8/26/2008 | | 8/26/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Case Summary | | | 8/26/2008 | | DONE |
|
|
|
|