Miscellaneous action | | | 5/11/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 11/19/2008 | 11/21/2008 | 11/21/2008 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm inspection completed. All correction per last inspection were made.KR
|
INSP-Final Inspection | 11/18/2008 | 11/19/2008 | 11/19/2008 | P | FAIL |
Forrest France
|
|
|
Three more additional devices need to be added. one in the walkin beer cooler that is open to the public, one in the deli due to wall blocking visual site of device and one in the wash area of pizza kitchen. Testing will need to be performed early am per store manager. KR
|
INSP-Final Inspection | 10/27/2008 | 10/28/2008 | 10/28/2008 | P | CANC |
Troy Cobbley
|
|
|
Ray McQueen Phone #: ###-#### Internet Inspection Request from: Diane Turner Inspection cancelled from web by: Diane Turner
|
INSP-Final Inspection | 10/24/2008 | 10/27/2008 | 10/27/2008 | P | CANC |
Troy Cobbley
|
|
|
Ray McQueen Phone #: ###-#### Internet Inspection Request from: Diane Turner Inspection cancelled from web by: Diane Turner
|
INSP-Sprinkler Rough-in | 9/25/2008 | 9/26/2008 | 9/26/2008 | A | PART |
Troy Cobbley
|
|
|
The new Chippery hood suppression system was tested today and it reported correctly. No other items have been tested or inspected.
|
INSP-Alarm Testing | 9/25/2008 | 9/25/2008 | 9/25/2008 | P | FAIL |
Troy Cobbley
|
|
|
The required module for the chippery has not been installed yet. Nobody was on site.
|
Inspection Record Card- Fire | 9/11/2008 | | 9/11/2008 | | DONE |
|
|
|
|
Telephone call | | | 9/11/2008 | | DONE |
|
|
|
left message with heidi for bret anderson at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/11/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/11/2008 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 9/10/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
Received application, two folders of submittal information and plan sheets FA-1, FA-2, FA-3; taken to fire review
|
Alarm Plan Check | | | 9/10/2008 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2008 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 9/9/2008 | | 9/9/2008 | | DONE |
Barbara Stitt
|
|
|
|
Alarm Plan Check | | | 9/8/2008 | | FAIL |
|
|
|
Please see redlined drawings and review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2008 | | DONE |
|
|
|
|
Telephone call | | | 9/8/2008 | | DONE |
|
|
|
Due to the nature of this project, I called Bret at Mountain Alarm to give him a 'heads up' that I would need to fail the drawings. I let him know the drawings and review comments would be at the front desk to pick up by tomorrow morning.
|
Miscellaneous action | | | 9/8/2008 | | DONE |
|
|
|
Faxed review comments to Mountain Alarm.
|
Application received | | | 8/27/2008 | | |
|
|
|
|
Case Summary | | | 8/27/2008 | | DONE |
|
|
|
|