Miscellaneous action | | | 3/10/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 1/29/2009 | 1/29/2009 | 1/29/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Issue and Print Permit | | | 1/29/2009 | | DONE |
|
|
|
|
INSP-Final Inspection | 1/27/2009 | 1/28/2009 | 1/28/2009 | P | CANC |
Troy Cobbley
|
|
|
The resubmitted drawings have not been approved yet.
|
Sprinkler Plan Check | 1/28/2009 | | 1/28/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2009 | | DONE |
|
|
|
|
Telephone call | | | 1/28/2009 | | DONE |
Cathy Brown
|
|
|
tlk to bryan johnson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/28/2009 | | |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 1/28/2009 | | 1/28/2009 | | DONE |
Cathy Brown
|
|
|
|
INSP-Final Inspection | 1/26/2009 | 1/27/2009 | 1/27/2009 | A | FAIL |
Troy Cobbley
|
|
|
Per Brian Johnson the remote area #4 will not work with the two additional elbows that have been added. He is to work out a solution and meet with Tim Frost and get an approval on the solution.
|
INSP-Final Inspection | 1/26/2009 | 1/26/2009 | 1/26/2009 | P | FAIL |
Troy Cobbley
|
|
|
The forward flow test passed inspection. The forward flow/FDC assembley did not pass inspection and needs to be installed as per the drawings. Two 3" 90's have been installed at the base of the riser. It appears per the drawings that a very slim safety factor was acheived on remoted area #4. I need verification that the 5% requirement is still satisfied. Ceiling tile needs to be removed where additional hangers were required for the pendant heads. The third floor roof access room needs a ceiling and a pendant, walls to the deck or upright protection needs to be provided throughout the third floor attic space.
|
INSP-Sprinkler Rough-in/Hydro | 10/8/2008 | 10/10/2008 | 10/9/2008 | P | DEFR |
Forrest France
|
|
|
Duplicate inspection request, see notes dated 10/8 and 10/9.
|
INSP-Sprinkler Rough-in/Hydro | 10/8/2008 | 10/9/2008 | 10/9/2008 | A | PART |
Forrest France
|
|
|
OH hydrostatic testing for the 1st, 2nd and 3rd floor piping completed acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 10/7/2008 | 10/8/2008 | 10/8/2008 | P | FAIL |
Forrest France
|
|
|
Lacking coverage at both the north and south stairway landings 1st floor, seismic bracing at two locations is not approved including at the riser and the 3rd floor. See locations marked on plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/7/2008 | | DONE |
|
|
|
t/c w lillie scales at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/7/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/7/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Inspection Record Card- Fire | 10/7/2008 | | 10/7/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/23/2008 | | 10/3/2008 | | PASS |
|
|
|
plans are approved
|
Plan resubmittals received | | | 9/23/2008 | | |
|
|
|
received "5" sets of plans with app for each set- put plans on fire shelf
|
Sprinkler Plan Check | 8/29/2008 | | 9/9/2008 | | FAIL |
|
|
|
These plans were denied due to deficiencies and lacking information. Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set will be maintained for 5 working days.
Note: The contractor and I have reviewed the discrepancies over the phone.
|
Early Start | | | 9/8/2008 | | DONE |
|
|
|
Approved Early Start request (Doc attached).
|
Case Summary | | | 8/29/2008 | | DONE |
|
|
|
|
Application received | | | 8/29/2008 | | |
|
|
|
|
Pending Assignment by SAM | 8/29/2008 | | | | |
|
|
|
|