INSP-Final Inspection | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Alarm Testing | 9/25/2008 | 9/29/2008 | 9/29/2008 | A | PASS |
Forrest France
|
|
|
Fire alarm work passed field testing.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/10/2008 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/4/2008 | | PASS |
|
|
|
On site review-approved as drawn.
|
Plan assigned to (Scott) | | | 9/3/2008 | | DONE |
Sam Rogers
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (SAM) | | | 9/3/2008 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|