Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR08-00616
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 7201 W FAIRVIEW AVE
Project NameSPR-Burlington Coat Factory
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of adding and relocating fifteen heads to accommodate new wall and ceiling configuration below the mezzanine.

(BURLINGTON COAT FACTORY) Permit to remodel a 65,551 square foot tenant space and make cosmetic exterior changes per approved plans and CZC08-00104. Work to include: [Demolition of existing floor coverings, existing storefront, interior non-bearing walls,] {construction of interior non-bearing walls to create new accessible restrooms, a count room, a cash office, a managers office, a break room,} new flooring throughout, new cash wraps, new storefront system, and interior finishes in compliance with chapter 8 of the IBC. This building is fully fire sprinklered for area increase any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary  8/8/2016 DONE
Plan assigned to (OutSourced)12/22/2008 6/17/2014 DONE
DetailsTim Frost
Assigned to Tim Frost
INSP-Final Inspection4/7/20094/7/20094/7/2009PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection3/27/20093/27/20093/27/2009PPART
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro3/5/20093/5/20093/5/2009APASS
DetailsTroy Cobbley
The remaining sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro2/3/20092/3/20092/3/2009PPART
DetailsTroy Cobbley
See the city approved resubmitted plans for the locations where the sprinkler piping can be covered. I requested a set of as-builts showing the actual piping arrangement on the north end of the remodeling work.
Issue and Print Permit  12/29/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/24/2008 DONE
Sprinkler Plan Check12/24/2008 12/24/2008 PASS
DetailsTim Frost
See attached comments.
There are notes for the field inspector.
Inspection Record Card- Fire12/24/2008 12/24/2008 DONE
DetailsCathy Brown
Telephone call  12/24/2008 DONE
tlk to jeff ###-#### that permit and no fee and ready to be picked up
Permit Ready to Issue  12/24/2008 DONE
Telephone call  12/22/2008 DONE
DetailsTim Frost
Called Broadie at TVFP and told him he had to prove the pipe sizes by some method. Project is on hold until he provides proof.
FIR-Aging Inspection12/15/200812/15/200812/16/2008 NR
DetailsTroy Cobbley
Per Jeff the plans will be resubmitted with additional work shown.
Plan resubmittals received  12/16/2008 DONE
received 1 application, 1 letter of transmittal,and 3 copies of sheet FP-1 THIS PERMIT WAS ISSUED ON 9-5-08 taken to Scott A.
Sprinkler Plan Check9/5/2008 9/5/2008 PASS
DetailsScott Arellano
PLANS/APPL TAKEN TO FRONT DESK  9/5/2008 DONE
Inspection Record Card- Fire9/5/2008 9/5/2008 DONE
DetailsCathy Brown
Telephone call  9/5/2008 DONE
DetailsCathy Brown
tlk to brodie that permit and fees are ready to be picked up
Permit Ready to Issue  9/5/2008 DONE
DetailsCathy Brown
Issue and Print Permit  9/5/2008 DONE
Application received  9/3/2008  
Pending Assignment by SAM9/3/2008 9/3/2008 DONE
DetailsTim Frost
Planned assigned to Johnson Consulting due to change in area head spacing. Ext/130 New/225.