Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR08-00623
StatusFinaled
Name IDAHO FIRE PROTECTION
Site Address 545 N BENJAMIN LN Unit: 155
Project Name 
Customer Number 
ePlanReview 
Description
FIR Work Scope: The Fire Sprinkler scope consists of adding and relocating 90 down head to accommodate a new wall & ceiling layout. This modification does not appear to adversely affect the operation of the system The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD08-01853.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/29/200810/29/200810/29/2008PPASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in10/3/200810/3/200810/3/2008PPASS
DetailsTroy Cobbley
The sprinkler rough-in is ok but the sprinkler piping can not be covered until the insulation that is hanging from the deck and blocking the upright sprinklers has been repaired and verified by an inspection.
Issue and Print Permit  10/3/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/23/2008 DONE
Details
Inspection Record Card- Fire9/23/2008 9/23/2008 DONE
Details
Sprinkler Plan Check9/5/2008 9/18/2008 PASS
Details
plans are approved
Application received  9/5/2008  
Case Summary  9/5/2008 DONE
Pending Assignment by SAM9/5/2008