Permit Information
Permit NumberFIR08-00627
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 12891 W MCMILLAN RD
Project NameVERIZON WIRELESS
Customer Number 
ePlanReview 
Description
Scope of Work: UG Only
The scope will begin from the existing 8” UG dead end main. From there run 80’ of new 6” c900 out through a new post indicating valve and then rise up into the riser room of the 3,750-ft/2 single story structure. The fire sprinkler underground work shall comply with NFPA 13-2007, NFPA 24-2007 the IFC-2006, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD08-00178. The overhead will be submitted under a separate permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/12/20093/12/20093/12/2009PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush11/4/200811/5/200811/5/2008APASS
DetailsTroy Cobbley
Underground flush passed. The water flow seemed low but there was a long run of hose. I will verify water supply during forward flush.
INSP-Sprinkler Rough-in/Hydro11/4/200811/5/200811/5/2008APASS
DetailsTroy Cobbley
Underground hydro test passed
INSP-Sprinkler Rough-in/Hydro10/30/200810/31/200810/31/2008AFAIL
DetailsTroy Cobbley
The underground hydro test failed.
INSP-Sprinkler Rough-in10/17/200810/17/200810/17/2008PPASS
DetailsTroy Cobbley
Per Mark Senteno the PIV is ok to be located approximately 12' from the building. The remaining underground piping can be covered. I let the general contractor know that it would be a good idea to install conduit in the trench prior to bury for the monitoring of the tamper switch.
INSP-Sprinkler Rough-in10/14/200810/15/200810/15/2008AFAIL
DetailsTroy Cobbley
The PIV is located 12' from the building not the required 40'. The approved plans show 40'. Relocate the PIV or get fire dept approval for the new location.
INSP-Sprinkler Rough-in/Hydro9/16/20089/16/20089/16/2008PPASS
DetailsTroy Cobbley
Todays inspection was for just the 12'-0" of 6" stub-out. This underground piping is ok to bury.
Sprinkler Plan Check9/9/2008 9/15/2008 PASS
Details
These plans were approved with conditions. An additional hydrant appears to be required. Plans are approved w/conditions by Bryan Johnson
PLANS/APPL TAKEN TO FRONT DESK  9/15/2008 DONE
DetailsCathy Brown
Telephone call  9/15/2008 DONE
DetailsCathy Brown
tlk to jeff anderson ###-#### that permit and fees are ready to be picked up
Inspection Record Card- Fire9/15/2008 9/15/2008 DONE
DetailsCathy Brown
Permit Ready to Issue  9/15/2008 DONE
DetailsCathy Brown
Issue and Print Permit  9/15/2008 DONE
Application received  9/9/2008  
Pending Assignment by SAM9/9/2008    
DetailsSam Rogers