Miscellaneous action | | | 3/11/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 1/28/2009 | 1/28/2009 | 1/28/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 1/16/2009 | 1/20/2009 | 1/20/2009 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in | 12/22/2008 | 12/23/2008 | 12/23/2008 | A | PART |
Forrest France
|
|
|
See approved plans for circled areas okay for ceiling cover initialed with today's date.
|
INSP-Sprinkler Rough-in | 11/25/2008 | 11/26/2008 | 11/26/2008 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the 3rd floor lobby piping that can be covered.
|
Sprinkler Plan Check | 9/9/2008 | | 9/23/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 9/23/2008 | | 9/23/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 9/23/2008 | | DONE |
Cathy Brown
|
|
|
tlk to brodie at ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 9/23/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 9/23/2008 | | |
|
|
|
|
Application received | | | 9/9/2008 | | |
|
|
|
|
Pending Assignment by SAM | 9/9/2008 | | | | |
Sam Rogers
|
|
|
|