INSP-Final Inspection | 11/19/2009 | 11/20/2009 | 11/20/2009 | A | PASS |
Forrest France
|
|
|
Remainder of fire alarm system work passed site testing, permit final okayed.
|
INSP-Alarm Testing | 4/13/2009 | 4/14/2009 | 4/14/2009 | A | PART |
Forrest France
|
|
|
Fire alarm interconnections for the east half (right hand side) of the new tool passed inspection.
|
FIR-Aging Inspection | 1/7/2009 | 1/7/2009 | 1/7/2009 | | DEFR |
Forrest France
|
|
|
Pending site inspection request.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/6/2008 | | DONE |
|
|
|
|
Alarm Plan Check | | | 10/2/2008 | | PASS |
|
|
|
Onsite review. Plans approved subject to field verification of the power supply calculations, inlcuding exisitng system loads and battery capacity.
|
Plan assigned to (Scott) | | | 9/30/2008 | | DONE |
Sam Rogers
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (SAM) | | | 9/30/2008 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|