INSP-Final Inspection | 3/5/2009 | 3/6/2009 | 3/6/2009 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 3/4/2009 | 3/5/2009 | 3/5/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 3/3/2009 | 3/4/2009 | 3/4/2009 | A | FAIL |
Troy Cobbley
|
|
|
Still need the annual inspection for the existing fire sprinkler risers performed.
|
INSP-Sprinkler Rough-in/Hydro | 2/11/2009 | 2/12/2009 | 2/12/2009 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler rough-in passed and the piping can be covered. The items needing corrected will be verified at the final.
|
INSP-Sprinkler Rough-in/Hydro | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PART |
Troy Cobbley
|
|
|
Phases A and B inspected today. See the city approved plans for locations of corrections needed.
|
FIR-Aging Inspection | 1/21/2009 | 1/21/2009 | 1/22/2009 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
Issue and Print Permit | | | 10/22/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/1/2008 | | 10/17/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 10/17/2008 | | 10/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 10/17/2008 | | DONE |
Cathy Brown
|
|
|
tlk to trent bice ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Case Summary | | | 10/1/2008 | | DONE |
|
|
|
|
Application received | | | 10/1/2008 | | |
|
|
|
|
Pending Assignment by SAM | 10/1/2008 | | | | |
|
|
|
|