Miscellaneous action | | | 3/11/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 11/11/2008 | 11/12/2008 | 11/12/2008 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Troy Cobbley
|
|
|
The rough-in is passed. The piping in the office areas can be covered. The new piping has not been connected to the existing piping yet.
|
Issue and Print Permit | | | 10/27/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 10/24/2008 | | 10/24/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 10/24/2008 | | |
Cathy Brown
|
|
|
tlk to damaris melick ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/24/2008 | | DONE |
Cathy Brown
|
|
|
|
Sprinkler Plan Check | 10/6/2008 | | 10/22/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 10/6/2008 | | |
|
|
|
|
Pending Assignment by SAM | 10/6/2008 | | | | |
|
|
|
|