Miscellaneous action | | | 2/8/2011 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 1/28/2011 | 1/31/2011 | 1/31/2011 | A | PASS |
Forrest France
|
|
|
Correction items per last inspection verified for completion. Permit finaled.
|
FIR-Aging Inspection | 12/7/2010 | 12/7/2010 | 12/8/2010 | | FAIL |
Forrest France
|
|
|
See permit activity notes dated 11/12.
|
FIR-Aging Inspection | 8/24/2010 | 8/24/2010 | 8/24/2010 | | FAIL |
Forrest France
|
|
|
Pending repair and retest of correction notice items.
|
FIR-Aging Inspection | 6/24/2010 | 6/24/2010 | 6/24/2010 | | PEND |
Forrest France
|
|
|
Need site inspection request for permit final by contractor after noted corrections have been finished- see permit activity notes.
|
Telephone call | | | 6/7/2010 | | DONE |
|
|
|
Spoke to Lori who stated she would need to talk to Bill and get back to me.
|
Issue and Print Permit | | | 3/25/2009 | | DONE |
Rita DeYoung
|
|
|
|
INSP-Alarm Testing | 12/5/2008 | 12/5/2008 | 12/5/2008 | A | FAIL |
Forrest France
|
|
|
See field inspection notes 11/12
|
INSP-Final Inspection | 11/10/2008 | 11/12/2008 | 11/12/2008 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for the redlined list of items needing correction which include deleting the heat detector and provide as-builts, repair the emergency phone in the elevator, provide a map at the facp and find where the missing alarm signal is since seven where sent but only six were received. Also the fire alarm panel installed, a Radionics D9412, is not the panel submitted for approval. The radio transmitter is correct. The contractor needs to resubmit or make some sort of arrangements with the plan reviewer for this change.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/23/2008 | | 10/23/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/23/2008 | | DONE |
|
|
|
left message with lori for alan manor at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/23/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/23/2008 | | DONE |
|
|
|
|
Alarm Plan Check | 10/9/2008 | | 10/9/2008 | | PASS |
Stephanie L. Cobbley
|
|
|
|
Application received | | | 10/9/2008 | | |
|
|
|
|
Plan assigned to (Stephanie) | 10/9/2008 | | 10/9/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Case Summary | | | 10/9/2008 | | DONE |
|
|
|
|