INSP-Final Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 12/2/2008 | 12/3/2008 | 12/3/2008 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test passed
|
INSP-Sprinkler Rough-in/Hydro | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | PART |
Troy Cobbley
|
|
|
24hr air test started at 10:30 with 42 1/2 psi on the guage
|
INSP-Sprinkler Rough-in/Hydro | 11/13/2008 | 11/14/2008 | 11/14/2008 | A | DONE |
Troy Cobbley
|
|
|
Overhead hydro completed. KR
|
INSP-Sprinkler Rough-in | 10/27/2008 | 10/27/2008 | 10/27/2008 | P | PART |
Troy Cobbley
|
|
|
The attic sprinkler piping can be covered.
|
Sprinkler Plan Check | 10/13/2008 | | 10/22/2008 | | PASS |
|
|
|
Plans & Calculations are Approved by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 10/22/2008 | | 10/22/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 10/22/2008 | | DONE |
Cathy Brown
|
|
|
tlk to Chris Wilson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/22/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 10/22/2008 | | DONE |
|
|
|
|
Application received | | | 10/13/2008 | | |
|
|
|
|
Pending Assignment by SAM | 10/13/2008 | | | | |
|
|
|
|