Miscellaneous action | | | 9/3/2009 | | DONE |
|
|
|
Fire alarm plans taken to records for scanning
|
INSP-Final Inspection | 8/12/2009 | 8/13/2009 | 8/13/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 7/28/2009 | 7/29/2009 | 7/30/2009 | P | FAIL |
Troy Cobbley
|
|
|
All of the initiating devices were tested but when it came time to verify signals nothing matched including the building address. All devices will need to be retested. All of the duct smoke detectors have been deleted as well as the dry pipe valve. As-builts are required. Strobe coverage is missing in the east lobby. It was addressed on the city approved plans but was not dealt with during installation. Strobe coverage had to be increased in a meeting room.
|
INSP-Final Inspection | 7/28/2009 | 7/28/2009 | 7/28/2009 | P | CANC |
Forrest France
|
|
|
Troy, Can we set this up for 3:00ish? Please call me as soon as you may know, so that I can set up the sprinkler guys. Thanks, Jason ###-#### Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
|
INSP-Final Inspection | 7/28/2009 | 7/29/2009 | 7/28/2009 | A | CANC |
Troy Cobbley
|
|
|
Troy, Can we do this early in the morning? Please let me know as soon as possible, so I can set it up with the GC and the Sprinkler guys. Thanks, Jason ###-#### Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
|
FIR-Aging Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 | | NR |
Troy Cobbley
|
|
|
Work is in progress.
|
Issue and Print Permit | | | 2/17/2009 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 2/5/2009 | | 2/12/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 2/12/2009 | | 2/12/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
see redlines and review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2009 | | DONE |
|
|
|
approved plans available for contractor pick-up
|
Inspection Record Card- Fire | 2/12/2009 | | 2/12/2009 | | DONE |
|
|
|
|
Telephone call | | | 2/12/2009 | | DONE |
|
|
|
t/c w jason minnick at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/12/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/5/2009 | | |
Stephanie L. Cobbley
|
|
|
Rec'd one copy of app and three copies of plans- taken to fire review
|
Alarm Plan Check | | | 10/28/2008 | | FAIL |
|
|
|
No review done. Plans designed with horn/strobes, however this is an A3 occupancy with an occupant load of 1000. Plans need to be redesigned and resubmitted based on having voice evacuation.
|
Telephone call | | | 10/28/2008 | | DONE |
|
|
|
Spoke with Jason at Audio Electronics and let him know the plans were being denied. He is aware he will need to redesign the system with voice evacuation due to the occupant load. He stated to just throw away the plans that were submitted.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/28/2008 | | DONE |
|
|
|
plans thrown away per contractor request
|
Application received | | | 10/21/2008 | | DONE |
|
|
|
|