Case Summary | | | 9/9/2016 | | DONE |
|
|
|
|
Miscellaneous action | | | 5/11/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 12/30/2008 | 12/31/2008 | 12/31/2008 | A | PASS |
Forrest France
|
|
|
New HD's, voltage monitor and elevator shunt trip passed functional testing, fire alarm permit finaled.
|
Issue and Print Permit | | | 10/31/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan resubmittals received | | | 10/30/2008 | | |
|
|
|
received 1 resubmitted application/information that was requested .
|
Plan assigned to (Stephanie) | 10/30/2008 | | 10/30/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
put back in the rev stage as this received re-submittals.
|
Alarm Plan Check | | | 10/30/2008 | | PASS |
|
|
|
No written comments - quick permit
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/30/2008 | | 10/30/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/30/2008 | | DONE |
|
|
|
left vm for charlie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/30/2008 | | DONE |
|
|
|
|
Application received | | | 10/28/2008 | | |
|
|
|
|
Plan assigned to (Stephanie) | 10/28/2008 | | 10/28/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 10/28/2008 | | DONE |
|
|
|
Left a message for Charlie Bayne asking for clarification on the elevator shunt trip operations for the heat detector adds in the elev. mech. rm and shaft.
|
Alarm Plan Check | | | 10/28/2008 | | FAIL |
|
|
|
Plans denied. Heat detectors added for elevator recall, however no indications of shunt trip or 120v monitoring.
|
Telephone call | | | 10/28/2008 | | DONE |
|
|
|
Called Charlie and explained the plans are denied due to no shunt trip functions or 120v shunt trip power monitoring were shown for the added heat detectors to the elevator controls. I let him know there would not be any written comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/28/2008 | | DONE |
|
|
|
plans are not being returned to contractor.
|