Miscellaneous action | | | 5/11/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 3/27/2009 | 3/30/2009 | 3/30/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The reporting to the central station had to be changed.
|
INSP-Final Inspection | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | FAIL |
Troy Cobbley
|
|
|
I received a phone call asking me to please perform an afternoon inspection even though it was not called in. I arrived at the project and found that the fire alarm system was still in the process of being installed. I went ahead and did a preliminary inspection and found the new manual pull stations had been installed too high and one was located too far from the exterior exit door. We set off the audio/visuals which passed sync and functionality. Several a/vs, see the as-built plans, need to be brighter or be relocated to provide code compliant coverage. See the correction notice left on site for a full list of items needing addressed.
|
Plan assigned to (Stephanie) | 3/18/2009 | | 3/24/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
3/24/2009 08:59:54 SLC - activity updated through activity FIRA24 from case FIR08-00750.
|
Alarm Plan Check | 3/24/2009 | | 3/24/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
See redlined plans and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 3/24/2009 | | DONE |
|
|
|
Approved redlined plans available at front counter
|
Telephone call | | | 3/24/2009 | | DONE |
|
|
|
left message w joe for mike brown at ###-#### - resubmittal ready to be picked up and fee given
|
Permit Ready to Issue | | | 3/24/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/24/2009 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/24/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/18/2009 | | |
Stephanie L. Cobbley
|
|
|
Received application and three copies of submittal booklet, and sheet pages FA-0.0, FA-1.0, FA-2.0A, FA-2.0B; taken to fire review
|
CHANGE STATUS TO (ISS) | | | 3/4/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/4/2009 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 2/23/2009 | | 3/3/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Miscellaneous action | | | 3/3/2009 | | DONE |
|
|
|
NOTE: 3/3/09 - Floorplan layout (walls) have been modified. There are a few areas (see redlines on plans) where it is not clear what is being demo'd and what is actually there. Some notification may need to be added if these areas have full height walls rather than the assumed 'cubicles'. Inspector to field verify NFPA 72 spacing requirements have been met.
|
Alarm Plan Check | 3/3/2009 | | 3/3/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
See redlined plans and review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2009 | | DONE |
|
|
|
Approved redlined plans available at front counter
|
Inspection Record Card- Fire | 3/3/2009 | | 3/3/2009 | | DONE |
|
|
|
|
Telephone call | | | 3/3/2009 | | DONE |
|
|
|
left vm for ken webster at ###-#### - resubmittal ready and fees given
|
Permit Ready to Issue | | | 3/3/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/23/2009 | | |
Stephanie L. Cobbley
|
|
|
Plan Modification: Received application, three copies of data sheets, and plan pages FA-0.0, FA-1.0, FA-2.0A, FA-2.0B; taken to fire review
|
INSP-Final Inspection | 1/28/2009 | 1/29/2009 | 1/29/2009 | A | PART |
Troy Cobbley
|
|
|
The area "A" system has passed testing. Revised plans incorporating all of the changes as noted on the inspection entry dated 1-28-09 are to be resubmitted for approval prior to final inspection and signoff when area "B" is complete.
|
INSP-Alarm Testing | 1/27/2009 | 1/28/2009 | 1/28/2009 | P | FAIL |
Troy Cobbley
|
|
|
Bruce provided me with a set of as-built plans upon arrival. These as-built plans do not reflect the actual installation and the installation is not code compliant in several respect. A resubmittal for plan review is required, which is to include as built modifications and revised NAC circuit calculations. I annotated the corrections needed in red ink on the as builts for their reference. These corrections include strobes that are overspaced off of walls in several areas, and an area in the Mail Room that has no strobe coverage at all but is required due to a full height wall that was not shown on the plans; a strobe that was installed in the Mail Room which was not shown on the as-builts, an additional pull station which is required at the north exit door that is not installed or shown on the approved plans, the fire alarm panel which is not located as shown on the city approved plans but is now located in a room completely across the building; an additional fire sprinkler riser with a PIV tamper switch, two backflow tamper switches and a flow switch which has been connected to the new fire alarm system which was not shown on the city approved fire alarm plans. Also per the scope of work there are no hvac smoke duct detectors shown but the as-builts show two hvac units with detectors and interconnection with the FACP which matches the installation. Approved resubmittals will be required prior to final inspection of this project showing all of the listed changes and any others as the inspection progresses. The items that were tested today and passed are all of the new sprinkler devices, phone lines, NAC interconnects and the two area smoke detectors. The two duct smoke detectors were not tested due to not having access to the temperature controls for the hvac units.
Also the installation has only been done for area A as shown the issued plans; area B is to be completed after relocating the occpants into area A after it has been completed and approved for occupancy; at which time the existing Simplex will be removed and devices connected to the new FACP. This Phasing was not indicated on the Alarm Application but will be acceptable as long as alarm monitoring is not interrupted.
|
Issue and Print Permit | | | 1/26/2009 | | DONE |
Tisha Gallop
|
|
|
|
Alarm Plan Check | | | 1/22/2009 | | PASS |
|
|
|
See review comments and redlined drawings
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2009 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/22/2009 | | 1/22/2009 | | DONE |
|
|
|
|
Telephone call | | | 1/22/2009 | | DONE |
|
|
|
t/c w ken at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 1/22/2009 | | DONE |
|
|
|
|
Telephone call | | | 1/20/2009 | | DONE |
|
|
|
Recieved a call from Allied General asking if they could start pulling wire prior to getting approved plans. I let him know he could pull the wire since I have the resubmittal in the office, but if changes had to be made based on my review it would be their responsibility to incorporate the changes.
|
Plan resubmittals received | | | 1/15/2009 | | |
Sam Rogers
|
|
|
Rec'd plan mod- three copies of application and plans- taken to fire review
|
Plan assigned to (SAM) | 1/15/2009 | | 1/15/2009 | | DONE |
Sam Rogers
|
|
|
|
Telephone call | | | 1/13/2009 | | DONE |
|
|
|
Called to discuss the discrepencies in the plans with Ken Webster, but he was unavailable. I left him a message as a courtesy to let him know the plans were denied and that he could pick up the redlined plans.
|
Alarm Plan Check | | | 1/13/2009 | | FAIL |
|
|
|
See comments and redlines
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2009 | | DONE |
|
|
|
Denied plans are at the front counter
|
Miscellaneous action | | | 1/13/2009 | | DONE |
|
|
|
Faxed review comments to contractor
|
Plan assigned to (Stephanie) | 1/9/2009 | | 1/9/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | | | 11/20/2008 | | FAIL |
|
|
|
See review comments and redlined drawings
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2008 | | DONE |
|
|
|
plans available for contractor pick up at front counter
|
Miscellaneous action | | | 11/20/2008 | | DONE |
|
|
|
Faxed review comments to Allied General
|
Telephone call | | | 11/20/2008 | | |
|
|
|
gave plans to joe fink with allied general per stephanie c. denied
|
Application received | | | 11/4/2008 | | |
|
|
|
|
Plan assigned to (Stephanie) | 11/4/2008 | | 11/4/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|