Miscellaneous action | | | 3/11/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 1/20/2009 | 1/20/2009 | 1/20/2009 | A | PART |
Forrest France
|
|
|
OH fire sprinkler system modifications at the remainder of the tenant remodel area okayed for cover.
|
INSP-Sprinkler Rough-in/Hydro | 12/17/2008 | 12/17/2008 | 12/17/2008 | P | PART |
Forrest France
|
|
|
C/N regarding mixed temp. and response heads completed. Standard response heads installed per plan submittals.
|
INSP-Final Inspection | 12/16/2008 | 12/16/2008 | 12/16/2008 | P | FAIL |
Forrest France
|
|
|
Noted mixed response and temperature heads within the same fire area at the NE portion of tenant remodel.
|
INSP-Sprinkler Rough-in/Hydro | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PART |
Forrest France
|
|
|
See approved city set of plans for area marked in red OK to cover. KR
|
Sprinkler Plan Check | 11/5/2008 | | 11/17/2008 | | DONE |
|
|
|
plans are approved
|
Inspection Record Card- Fire | 11/17/2008 | | 11/17/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/17/2008 | | DONE |
|
|
|
|
Case Summary | | | 11/5/2008 | | DONE |
|
|
|
|
Application received | | | 11/5/2008 | | |
|
|
|
|
Pending Assignment by SAM | 11/5/2008 | | | | |
|
|
|
|