INSP-Final Inspection | 4/14/2009 | 4/15/2009 | 4/15/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. The underground flush passed. The contractor is to install a 1/2" plug on the outside alarm bell back box as discussed.
|
INSP-Final Inspection | 4/13/2009 | 4/13/2009 | 4/13/2009 | P | CANC |
Troy Cobbley
|
|
|
To be cancelled per Scott.
|
CHANGE STATUS TO (ISS) | | | 4/9/2009 | | DONE |
Tisha Gallop
|
|
|
picked up permit
|
Case Summary | | | 4/9/2009 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/4/2009 | | 2/4/2009 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 2/4/2009 | | DONE |
Cathy Brown
|
|
|
lft a vm with bryan johnson ###-#### that permit is ready to be picked up
|
Permit Ready to Issue | | | 2/4/2009 | | DONE |
Cathy Brown
|
|
|
|
Plan resubmittals received | | | 2/3/2009 | | |
Tim Frost
|
|
|
Plan mod rec'd- three copies of plans and apps
|
Sprinkler Plan Check | 2/3/2009 | | 2/3/2009 | | DONE |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2009 | | DONE |
|
|
|
|
Miscellaneous action | | | 1/30/2009 | | DONE |
Tisha Gallop
|
|
|
customer picked up failed plans
|
Sprinkler Plan Check | 1/29/2009 | | 1/29/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
TRF reviewed the as built drawings and hydraulics only. The only change on the as built drawings that was reported or reviewed was changing one room from four to two heads. The heads were in the hydraulics most remote area.
|
Telephone call | | | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
lft ms for trent bice ###-#### that plan has been rejected 1:30 pm
|
INSP-Sprinkler Rough-in/Hydro | 1/27/2009 | 1/28/2009 | 1/28/2009 | A | PASS |
Troy Cobbley
|
|
|
Per Scott the plans and hydraulic calculations are being resubmitted for 18'x18' spacing in the Recreation Room. Based on this conversation the sprinkler piping is ok to cover in this room. If the hydraulic calculations don't work additional heads will need to be added as per the original approved plans at the contractors expense.
|
Plan resubmittals received | | | 1/28/2009 | | |
Sam Rogers
|
|
|
Rec'd plan mod- 3 copies of application and plans- taken to fire review
|
INSP-Sprinkler Rough-in/Hydro | 1/20/2009 | 1/21/2009 | 1/21/2009 | A | PART |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover on both floors except for the first floor west entertainment room. The heads in this room are overspaced.
|
INSP-Sprinkler Rough-in | 1/20/2009 | 1/20/2009 | 1/20/2009 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled per the fitter.
|
INSP-Sprinkler Rough-in | 1/16/2009 | 1/20/2009 | 1/19/2009 | A | CANC |
Troy Cobbley
|
|
|
Rough to cover inspection please call 1 hour before inspection time. Javier is the contact ###-#### Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|
INSP-Sprinkler Rough-in/Hydro | 1/15/2009 | 1/16/2009 | 1/16/2009 | P | CANC |
Troy Cobbley
|
|
|
Rough to cover inspection has been rescheduled for tuesday. The project was not ready for inspection with tenting and piping needing completing.
|
Issue and Print Permit | | | 12/17/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 12/15/2008 | | 12/15/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 12/15/2008 | | DONE |
Cathy Brown
|
|
|
lft ms with secretary for trent bice ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 12/15/2008 | | DONE |
Cathy Brown
|
|
|
|
Sprinkler Plan Check | 12/1/2008 | | 12/12/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 11/10/2008 | | |
|
|
|
|
Case Summary | | | 11/10/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan assigned to (SAM) | 1/28/2009 | | | | |
Sam Rogers
|
|
|
|