Miscellaneous action | | | 3/11/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 12/17/2008 | 12/19/2008 | 12/19/2008 | P | PASS |
Forrest France
|
|
|
Corrections provided, fire sprinkler permit finaled.
|
INSP-Final Inspection | 12/4/2008 | 12/4/2008 | 12/4/2008 | P | PART |
Forrest France
|
|
|
Correction notice items have been completed, remainder of overhead work is approved for cover. NOTE: pendent head at the server room is obstructed by a surface mounted liebert unit filter cage, coverage to be adjusted to avoid blockage prior to permit final.
|
INSP-Sprinkler Rough-in | 11/20/2008 | 11/21/2008 | 11/21/2008 | A | PART |
Forrest France
|
|
|
OH system modifications at the tenant remodel area are okay for cover except as red-lined on approved plans. Items include two overspaced arm-over hangers, one head at an office to be maintanted no more than 9' off an adjacent wall, noted two leaks to be repaired, one small room not yet completed.
|
Sprinkler Plan Check | 11/12/2008 | | 11/17/2008 | | PASS |
|
|
|
Plan sare approved by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 11/17/2008 | | 11/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 11/17/2008 | | 11/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 11/17/2008 | | DONE |
Cathy Brown
|
|
|
lft vm with tyson smith ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 11/17/2008 | | DONE |
|
|
|
|
Case Summary | | | 11/12/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Application received | | | 11/12/2008 | | |
|
|
|
|
Pending Assignment by SAM | 11/12/2008 | | | | |
|
|
|
|