FIR OH Work Scope:
The fire sprinkler scope consists of raising the 2.5” cross mains and 1.25” branchlines as noted on the plan. The contractor will also remove the existing drops / pendant head protection as noted on the reference sheet and replace them with 193 quick response SSU heads on sprig ups. The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is not attached to BLD08-02320.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/10/2010 DONE
Sent to records for scanning
INSP-Final Inspection3/9/20103/9/20103/9/2010PPASS
DetailsTroy Cobbley
Permit finaled.
INSP-Final Inspection2/3/20092/4/20092/4/2009PPART
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro2/3/20092/4/20092/4/2009PPASS
DetailsTroy Cobbley
The above ground hydro test passed.
INSP-Final Inspection1/29/20092/2/20092/2/2009AFAIL
DetailsTroy Cobbley
Provide hydro testing per NFPA 13 and 25. Provide data sheets for the newly installed valve on the backflow preventor. Provide as-builts.
INSP-Sprinkler Rough-in1/14/20091/15/20091/15/2009PFAIL
DetailsTroy Cobbley
Remove 1" valve or provide tamper switch on the valve controlling water to the elevator shaft. The upright sprinklers along column line "D" are overspaced by being 8'-0" off of the column line/roof deck transition. The tamper switch on the backflow preventor does not meet the requirements of NFPA 72. Several sprinkler pendants on the second floor are located too close to the supply registers. Standard responce upright heads have been mixed with new quick responce heads over the sales floor. Earthquake bracing is missing on the 4" main. An additional pendant head is needed in the first floor storage room. Provide sprinkler coverage under the landing at the west stairs.
INSP-Conference11/25/200811/26/200811/26/2008ACANC
DetailsTroy Cobbley
Cancel per Mike
Issue and Print Permit  11/21/2008 DONE
Sprinkler Plan Check11/14/2008 11/20/2008 PASS
Details
Plans are approved by Bryan Johnson
PLANS/APPL TAKEN TO FRONT DESK  11/20/2008 DONE
DetailsCathy Brown
Inspection Record Card- Fire11/20/2008 11/20/2008 DONE
DetailsCathy Brown
Telephone call  11/20/2008 DONE
DetailsCathy Brown
lft a message to secretary for lilly ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/20/2008 DONE
DetailsCathy Brown
Inspection Record Card- Fire11/20/2008 11/20/2008 DONE
DetailsCathy Brown
Application received  11/14/2008  
Pending Assignment by SAM11/14/2008    
DetailsSam Rogers